station yards
station yards is a 53-acre, mixed-use, transit-oriented downtown built around the ronkonkoma long island rail road station in suffolk county, in the area long known as the ronkonkoma hub. tritec development group is developing the multi-phase project, tritec building company is building it, and tritec asset management plays a role in its management.
at full build-out, station yards is planned for about 1,450 apartment homes, 360,000 sq. ft. of commercial space, 195,000 sq. ft. of retail and 60,000 sq. ft. of hospitality. phase 1, alston, is complete with 489 apartments in six buildings. phase 2, the core, adds 563 apartments, 70,000 sq. ft. of retail and 16,500 sq. ft. of office: phase 2a (388 apartments) was completed in 2024 and phase 2b (175 apartments, financed with $113 million closed in july 2024) in 2026. phase 2c covers 6.72 acres with 285 apartments and a 30,000 sq. ft. northwell health medical office.
station yards sits off exit 60 of the long island expressway, next to long island macarthur airport, at suffolk county’s busiest lirr station, with express service to penn station and grand central. tritec building company also built out tenant spaces for cornucopia natural foods market, lucharitos, redefine meals and catholic health urgent care. in 2026, station yards expects more than 1 million visitors and 60+ events, from farmers markets and live music to murals by lula goce and jenna morello.
learn more at stationyardsli.com.
6 technology drive
developed by tritec development group, 6 technology drive is a class a medical office building located in the heart of the stony brook technology center, one of long island’s premier destinations for healthcare, research, and innovation. the building offers excellent visibility from nesconset highway (nys route 347) and is easily accessible for both patients and staff.
constructed by tritec building company, the building features a modern exterior of glass, brick, and efis panels. inside, the space is designed for functionality and efficiency, with wide, well-lit corridors and a layout that supports a variety of medical specialties. the building was developed for multi-tenant medical use, with attractive lobbies and ample surface parking to accommodate high patient volumes.
currently, 11,974 square feet of medical office space is available for lease on the main level, offering flexible configurations for healthcare providers. the building also features 9,000 square feet on the lower level, ideal for support staff or administrative functions, with additional caged storage available for medical records or equipment.
the building is also home to tritec asset management’s on-site office, the largest property management team in the stony brook technology center, ensuring responsive service and a well-maintained environment for all tenants.
located within 4 miles of three major hospitals —stony brook university hospital, mather hospital, and st. charles hospital —6 technology drive is ideally positioned for healthcare providers looking to grow their practices in a thriving medical corridor.
maria valanzano and steven d’orazio of colliers represent tritec at this property and are available to discuss leasing opportunities.
45 research way
located in the stony brook technology center, 45 research way is a high-quality class a office building offering flexible space for both medical and professional office users. developed and constructed by tritec building company, the property delivers a modern, efficient workspace in one of long island’s most prominent business and research communities.
the building features a timeless exterior of brick and glass, combining classic materials with a contemporary design. inside, tenants enjoy a functional layout and beautiful views overlooking a large scenic pond, creating a peaceful and inspiring environment for employees and visitors.
with more than 32,543 square feet currently available, the building offers flexible configurations to suit a wide range of tenant needs. tenants also benefit from ample surface parking, including electric vehicle charging stations, supporting both convenience and sustainability.
professionally managed by tritec asset management, the largest property management team in the stony brook technology center, the building ensures responsive service and a well-maintained environment.
45 research way is located just over a mile from stony brook university, placing tenants in close proximity to both the university and stony brook university hospital, as well as mather hospital and st. charles hospital, making it an ideal location for healthcare providers, university-affiliated organizations, and professional firms.
maria valanzano and steven d’orazio of colliers represent tritec at this property and are available to discuss leasing opportunities tailored to your business or practice.
catholic health urgent care at ronkonkoma
tritec building company completed the interior fit-out of a catholic health urgent care facility within an existing mixed-use building at station yards. the project transformed vacant retail space at ground level, located beneath four stories of occupied residential units, into a fully operational medical environment that supports efficient urgent care delivery.
the scope included a fully shielded x-ray room, multiple patient exam rooms, and a custom millwork reception and check-in area. mechanical, electrical, and plumbing systems were installed, with core drilling through the slab to connect to the active parking garage below. hvac systems featured rooftop condenser units on the fifth-floor roof.
the project was completed on an accelerated four-month schedule with minimal disruption, despite the logistical challenges of working below occupied residences and above an active garage.
since opening, the facility has become an active participant in the surrounding community, providing emergency medical support at large-scale events and engaging with residents through vendor-forward events focused on public health education and outreach. this ongoing presence reinforces catholic health’s commitment to accessible, community-based care.
cornucopia natural foods market
tritec building company completed the interior and exterior fit-out of cornucopia, a specialty natural foods market, within an existing mixed-use development. the project involved the transformation of raw retail space beneath residential units into a fully operational grocery environment with a strong focus on fresh food preparation and merchandising.
scope of work included extensive hvac installation with rooftop-mounted condensers, plumbing penetrations into an active parking structure below, and coordination of specialized infrastructure for refrigeration systems and food preparation areas. the team worked closely with the owner’s vendors to integrate kitchen equipment, produce refrigeration, walk-in coolers and freezers, and store-wide shelving systems.
custom butcher block checkout counters and exterior façade enhancements were installed to create a cohesive brand experience both inside and outside the store.
the project required detailed coordination across multiple trades and vendors and was successfully completed within a fast-track schedule.
since opening, cornucopia has become an active contributor to the station yards community. the market participates in community events throughout the development, helps curate the seasonal farmers market, and supports numerous charitable initiatives at both the local and national levels. through partnerships with organizations such as long island cares and participation in the 1% for the planet network, cornucopia extends its mission beyond retail, promoting healthy living, sustainability, and community engagement.
lucharitos station yards
tritec building company completed the ground-up construction of lucharitos, a vibrant fast-casual restaurant and central feature of the station yards community. the project delivered a fully customized dining and bar environment that reflects the brand’s unique aesthetic.
the scope included the installation of all underground utilities —electric, gas, sanitary, and domestic water systems—and a complete commercial kitchen build-out. tritec worked closely with the owner’s vendors to install kitchen equipment and a walk-in cooler.
architectural features included a custom millwork bar, saltillo tile flooring, and an accordion-style folding window opening to the outdoor bar area. interior finishes featured bold paint colors, decorative lighting, wood accent walls, and exposed spiral ductwork, creating an energetic and authentic atmosphere.
the project was completed on schedule, supporting the client’s planned operational launch.
since opening, lucharitos has become one of ronkonkoma’s most popular gathering places and a cornerstone of the station yards experience. throughout the year, residents and visitors are drawn to the restaurant during community events, whether enjoying hot chocolate and churros at holiday celebrations or a cold beer at a grooves on the green concert. its lively atmosphere, indoor-outdoor dining, and strong local following have established lucharitos as a premier food-and-beverage destination in station yards.
suffolk plastic surgeons
suffolk plastic surgeons has worked with tritec for more than two decades. in 2003, tritec building company fit out the practice’s first home at 179 belle mead road in the stony brook technology center: an 8,660 sq. ft., 25-room facility with exam rooms, operating rooms, physician offices and a spa, built in a building tritec developed and constructed. the practice stayed there for more than 20 years.
as the practice evolved, tritec asset management moved it to a newly renovated 3,500 sq. ft. suite at 24 research way, also in the technology center and developed, built and managed by tritec. tritec asset management handled the lease, oversaw the full transformation of the suite, formerly stony brook medicine’s plastic and cosmetic surgery center, and coordinated the move. under an aggressive occupancy deadline and changing design requirements, the team delivered new reception, consultation, exam and treatment spaces, and the practice moved without disruption to patient care. the practice celebrated the new office with a ribbon cutting in november 2026, and tritec asset management continues to manage the building.
“tim was reliable, honest, hard working and most conscientious. his efforts greatly facilitated our progress and our building was completed within the anticipated framework.”
hilton c. adler, m.d., facs, suffolk plastic surgeons, p.c., february 2003
shoregate
shoregate is a 418-unit class a rental community at 143 fourth avenue in downtown bay shore, ny, between the bay shore lirr station and main street. tritec development group developed shoregate and tritec building company built it after the town of islip approved the project in 2020. it was completed in 2024.
construction generated nearly 900 jobs, $55 million in earnings and $140 million in sales in suffolk county. residents are estimated to spend nearly $13 million a year in the town of islip. shoregate is ngbs silver certified, with solar panels, ev charging and individual garages. amenities include a pool and pavilion, rooftop lounge, game room with golf simulator, coworking space, fitness center, bocce and pickleball, plus ground-floor retail.
kincora
kincora is a 424-acre, 9 million sq. ft. mixed-use community in loudoun county, northern virginia, minutes from dulles airport. tritec development group is the land developer, in partnership with norton scott llc, and tritec building company built the infrastructure. the plan calls for 2,400 residential units, about 4 million sq. ft. of office, 472,825 sq. ft. of retail and 570 hotel rooms along the route 28 corridor.
tritec and its partner have invested $180 million in infrastructure, including two new bridges over the broad run river. kincora is home to a 1.3 million sq. ft. cyrusone data center, 200 lennar townhomes, the kincora fire safety center, temple baptist church, heronview (96 affordable units) and wawa. tritec also developed the jameson (333 luxury apartments) at kincora. about 180 acres will remain natural area, with trails along the broad run river and roughly 55 great blue heron nests, one of the largest rookeries on the east coast.
the core
the core is the second phase of station yards, the mixed-use downtown at the ronkonkoma lirr station. it includes 563 apartment homes in five residential buildings, two standalone retail buildings with 70,000 sq. ft. of retail, and 16,500 sq. ft. of office space. phase 2a (388 apartments) was completed in 2024 and phase 2b (175 apartments) in 2026. tritec development group developed the core, tritec building company built it, and tritec asset management manages it.
apartments come with energy star appliances, quartz countertops, in-home washers and dryers, and ev charging in covered garage parking. shared amenities include coworking spaces and private offices, a fitness center, two pools, two rooftop terraces, a basketball/pickleball gym, a sauna, a pet spa, a clubroom and a large courtyard with bbq stations and fire pits. the core opens onto the station yards village green and is steps from the lirr, the long island expressway and macarthur airport.
learn more at thecoreli.com.
alston
alston is the first phase of station yards in ronkonkoma, ny: 489 apartment homes in six buildings beside the ronkonkoma lirr station, completed in 2020. tritec development group developed alston, tritec building company built it, and tritec asset management is part of the management team. niles bolton associates was the architect.
alston offers studio through three-bedroom apartments with granite countertops, in-unit washers and dryers and bluetooth keyless entry. shared spaces include a pool and sundeck, four clubrooms, two fireplace lounges, two fitness centers, a yoga room and courtyards with fire pits and grills. its opening began the transformation of the ronkonkoma hub into station yards.
learn more at alstonli.com.
stony brook children’s developmental and behavioral pediatrics
tritec asset management completed the construction of the stony brook children’s developmental and behavioral pediatrics facility, located at 181 belle mead road in east setauket, ny. this project involved the comprehensive renovation of a former medical suite to create a modern, functional space designed to meet the specialized needs of children requiring developmental and behavioral care.
project details:
selective demolition: we began the project by carefully removing interior walls, hvac distribution lines, ceilings, millwork, flooring, and light fixtures within the existing medical suite, previously occupied by stony brook family medicine.
space demising: the space was restructured by installing a demising wall to create two separate suites. this process included demising the hvac, plumbing, electrical, and gas systems to serve the newly created suite.
suite construction: the new suite was constructed with attention to detail, ensuring the environment was both functional and welcoming. this included the installation of new wall partitions, a redesign of the fire sprinkler and fire alarm systems, and modifications to the hvac ductwork.
interior finishes: to enhance the aesthetic and functionality of the space, we supplied and installed new ceilings, led light fixtures, flooring, millwork, paint, and wall coverings.
design for special needs:
the space was thoughtfully designed to accommodate children with special needs, ensuring a safe, comfortable, and supportive environment for both patients and their families.
new village at patchogue
the new village mixed-use project brings the principles of smart growth and new urbanism to downtown patchogue.
an essential element of the new village development is to promote an active, pedestrian-friendly community. building off the existing character of main street, new village has reactivated the retail in patchogue. the vacancy rate in downtown patchogue hovered around 50% before the development of new village; today, that existing retail space is 95% leased, and patchogue is now home to 42 restaurants. new village has genuinely become a part of the community, hosting public outdoor concerts, farmers’ markets, festivals, and the taste of patchogue.
distinctively designed, the development has embraced and enhances the context of the existing historic main street and the adjacent village landmarks: the patchogue bank and the 31 west main building. tritec acquired six parcels of land around a municipal parking lot. many of the buildings were uninhabitable and needed to be demolished. tritec saved and relocated a vacant carnegie library to another part of the village. the library was initially donated to the village of patchogue by andrew carnegie in 1906. although the library was not on the historic registry, the residents wanted to preserve village history. tritec had the building put on blocks, and driven two blocks away, to be put on a foundation and made into a youth center for the patchogue medford library. tritec works hard to preserve and maintain the culture of the community where we work.
tritec building company was the construction manager for the entire new village project, including 31 west main street. the buildings are 4 and 5 stories high, and the construction is a wood frame over a concrete podium and structured parking. the entire development is home to 291 apartment homes, 45,000 sq.ft. of retail, and 17,000 sq.ft. of office space.
a study commissioned by the long island regional planning council conducted by 4ward planning showed that the revitalization of patchogue village from 2000 -2017 had created $693 million in total economic output. including new village, a total of 714 multi-family units were added to patchogue; their addition resulted in a more than $5 million surplus to the school district.
awards
2008 smart growth award from vision long island2009 top mixed-use project awarded by long island business news2013 top mixed-use project in suffolk county awarded by long island business newstritec was named the 2014 developer of the year by the association for a better long island and the commercial industrial brokers society, due primarily to the success of this project.in 2019, the village of patchogue was named one of the great places in america by the american planning association.
the jameson
tritec development group developed the jameson, a 333-unit apartment community at 20725 wood quay drive in dulles, va, in northern virginia, which opened in 2020. it sits at the western edge of kincora, the 424-acre mixed-use community tritec is developing at route 28 and route 7, less than five miles from washington dulles international airport. the building borders a 165-acre nature preserve with miles of walking trails and access to the broad run.
the four- and five-story building has a concrete lower level and first floor with wood-frame construction above, and it wraps a 543-space precast parking garage with ev charging. tritec building company served as owner’s agent, and dcs was the architect. for leasing information, visit thejameson.com.
the shipyard at port jeff harbor
tritec developed and constructed 112 multifamily apartment homes in the village of port jefferson, long island, new york. the project, built on the site of an abandoned motel, is located two blocks from main street across the road from port jefferson harbor.
the design of the project draws design inspiration from port jefferson’s maritime and shipbuilding roots and character from the surrounding structures. historic photos from the village archives can be found in amenity areas of the building, and the ceiling grid in the lobby has the same dimensions and timber thickness as the deck of the last ship built in port jefferson.
the facility is three stories of residences above a parking garage. the 168 parking spaces below the building eliminated the sea of asphalt that defined the site before construction. tritec made drastic improvements to a blighted mill creek that borders the property, restoring the waterway to serve as an amenity for the residents and the village.
the shipyard development is incorporated into and promotes port jefferson’s active, pedestrian-friendly lifestyle. by creating walking connections to the village, the shipyard residents bolster the retail and entertainment venues in port jefferson all year round. eliminating the unused, dilapidated motel and replacing it with a vibrant apartment building to bring millions of dollars of disposable income into the village annually.
the wel apartments in lindenhurst
tritec developed 260 residential units at 75 hoffman avenue in lindenhurst, long island, new york.
the new development, situated on a former industrial site, is located two blocks from wellwood avenue, the main thoroughfare in the village of lindenhurst, and across the street from lindenhurst train station. the location promotes both mass transit and enhances a walkable neighborhood. since the development process began, 17 new businesses have opened on wellwood and hoffman avenues.
the wel draws design inspiration from the site’s existing industrial roots and character from the surrounding neighborhoods. the wel took its name from lindenhurst history, honoring founder thomas welwood whose last name is misspelled on the main thoroughfare. tritec incorporated arched windows into the design reminiscent of the windows formerly found in the lakeville building that previously occupied the site. artifacts salvaged during demolition, like the original cast iron door from the boiler, will also be a part of the interior design of the new facility.
the facility is 3 and 4 stories in height and has underground parking below a portion of the building. tritec made drastic improvements to the creek that bisects the site. the building and two bridges will span the waterway, restored to its natural state as an amenity for the residents.
learn more about the wel at thewelapts.com.
north suffolk cardiology
tritec has worked with north suffolk cardiology, the largest cardiology practice on long island’s north shore, for more than 20 years. tritec development group developed the practice’s east setauket building, tritec building company built it, and tritec asset management manages it. tritec completed the original space in 2000.
in 2023, tritec building company expanded and renovated 17,684 sq. ft. across three office suites, one of them occupied throughout, so the practice kept seeing patients. the work added cardiac rehabilitation, consultation rooms, staff offices and a pet/ct suite housing a ge omni pet/ct, the first of its kind installed on long island. installing the scanner took precise construction and careful coordination with the manufacturer to get the equipment into the building. the project finished on schedule.
dealertrack technologies
tritec real estate company and castagna realty collaborated as real estate developers of a 233,000-square-foot office building at 3400 new hyde park road. the site is in the village of north hills, long island, new york. the nearly 10-acre site has structured parking and a building designed to be leed-certified.
spector group and combined resources consulting and design, inc designed the architecture for 3400 new hyde park jointly. spector is responsible for the building envelope and combined resources the interior spaces. interior features include highly collaborative work areas, a large gym, a basketball court, a gaming area, nap pods, and a terrace.tritec building company was the construction manager for 3400 new hyde park road, now the corporate headquarters for dealertrack technologies.
dealertrack technologies inc. makes programs for automobile dealers to improve their efficiency and profitability. its products include an online credit application network connecting more than 20,000 dealerships with more than 1,400 lenders.
brightview senior living port jeff
tritec building company was the construction manager for brightview senior living in port jefferson station, ny, the second brightview community tritec built after sayville. the 184,000 sq. ft. building on 8.5 acres has 170 units: 94 independent living, 50 assisted living and 26 wellspring memory care. market square architects designed it. the project included a newly built sewage treatment plant.
amenities include a movie theater, pub, billiards, fitness center, salon, libraries and dining rooms. outdoors, there is a year-round gardening room, a heated two-story porch, water features and four courtyards with a bocce court and putting green. the project was completed on schedule for occupancy in september 2022.
brightview senior living sayville
tritec building company was construction manager for brightview senior living in sayville, ny, a 154-unit, 157,559 sq. ft. rental community on 7.34 acres for seniors in independent living, assisted living and memory care, completed in february 2020. it was tritec’s first project for brightview, followed by brightview port jeff. its memory care neighborhood, wellspring village, is designed for residents living with alzheimer’s disease or other forms of dementia.
apartments vary by care level: independent living units have full kitchens, while memory care units do not. amenities include a restaurant, movie theater, bar, art studio and card room, plus courtyards with bocce, a putting green, gardening, walking trails and therapeutic memory care activities.
port jefferson surgery center
tritec building company built the 16,000 sq. ft. interior of the port jefferson surgery center, an article 28 ambulatory surgery facility at 1500 route 112 in port jefferson station, ny. the center is a partnership of 19 community surgeons, mather hospital and pinnacle iii. dominick a. termini, aia, of pallante design was the architect.
the build-out includes six operating suites, pre-op and post-op recovery, nursing stations, reception and administrative space. tritec installed the center’s complex systems: a chiller, negative and positive air pressure, humidification for procedure rooms, medical gas, vacuum and air, a steam generator for sterilization, and a generator that can power the whole building. construction ran from april 2017 to january 10, 2018.
135 engineers road
tritec acquired 135 engineers road, a 65,000 square foot industrial building in 2004. the purpose of the acquisition was to reposition the building from industrial to class b office. tritec building company removed 10,000 sq.ft. of the building to meet suffolk county waste discharge regulations and provide parking for office areas. since that time the building is now connected to the sewage treatment plant and can accept both medical and pharmaceutical tenants
the building’s renovation includes a new facade complete with a new insulated glass system, landscaping, and accent lighting. the building’s interior features a natural stone tile accented by blue granite stripes and cherry wood doors. the building’s circular core has a vibrant blue wall covering that is brought to life by a high-end lighting package. the lighting is made up of wall sconces, recessed lighting, and culminates in a chandelier located in the center of the core.
135 engineers road, located in hauppauge industrial park, now called the long island innovation park, is just minutes from the long island expressway. the park is home to 1,300 businesses and 55,000 employees, making it the largest office complex east of the mississippi river and the second largest in the country.
long island community hospital
tritec building company completed a 3,400 sq. ft. renovation of the main lobby, waiting area, elevator lobby and restrooms at long island community hospital in patchogue, ny, then known as brookhaven memorial hospital medical center, in 2018. designed by bld architecture, the new lobby uses tile, marble, wood veneer, back-painted glass and stainless-steel trim, with new recessed lighting.
tritec replaced the old vestibule with a larger entrance and automatic sliding doors. outside, the team replaced courtyard pavers, painted the building’s front and installed new landscaping. “our 1970s lobby received a 21st century makeover,” said richard margulis, then president and ceo of the hospital.
sun river health patchogue
tritec building company served as construction manager for the renovation of an existing facility into a new 80,000-square-foot health center for hudson river healthcare.
the building was formerly a verizon facility with 12-inch thick concrete floors, which proved to be a significant challenge during the renovation. converting the facility to a medical building required dozens of penetrations to be made for plumbing, electric, and gas. floors had to be x-rayed to avoid damaging the rebar in the concrete. including the concrete roof which required new roof drains and hvacv penetrations interior construction featured a unique modular construction type for the interior walls. construction took approximately nine months to complete.
• installed a fuji septic system 400’ away from the building with a force main• did extensive masonry repair to the existing exterior block and brick• replaced the all the parking lot curbs and pavement• installed an enormous amount of trees, shrubs and plantings to the landscaping• install new fire sprinkler and fire alarm systems
services include primary care, women’s health, pediatrics, podiatry, behavioral health, nutrition, hiv and hepatitis c services, urgent care, radiology, dental care, and optometry.
the patchogue health center employs 54 people and serves 9,000 patients annually.
jefferson’s ferry
this project, on a 50-acre site, is the first lifecare community on long island. it consists of 220 independent living apartments, 60 assisted living apartments, and a community building with pool, kitchen, dining, and resident amenities. thirty-two residential cottages also are located on the site. many of the interior finishes are worthy of a high-end hotel.
tritec was awarded the project at the 10% design documents stage, and tightly controlled the budget from design and permitting through construction, punch list, and sign off.
the project was completed, on schedule, for occupancy in may 2001.
tritec has maintained a relationship with jefferson’s ferry since the initial project completion. tritec built a porte-cochère on the community building in 2007. many of the same team members worked on woodland pond, a similar facility in new paltz, new york, completed by tritec in 2010.
kennedy row
tritec and our partner jbg developed the apartment homes at kennedy row. kennedy row, completed in 2013, is a 142 market-rate apartment homes of exceptional quality located in the hill east region of washington, d.c. the neighborhood has experienced a transformative renaissance during the construction of this project, highlighted by the renovation of eastern high school. kennedy row is central to the rfk metro, barracks row, h street, situated in capitol hill’s charming residential neighborhood. residents have the full experience of capitol hill living with immediate access to all the city offers.
the apartments are designed to incorporate abundant natural light; large windows create a direct connection with nature and highlight the area’s urban setting. the project features multiple courtyards elevated above the street level with seating, fire pits, and barbecues and a roof deck with spectacular views of the capitol building.
the apartments were fully leased and sold to bell partners in 2016.
100 & 102 motor parkway
history
in 1998, tritec real estate company, inc. acquired 19.6 acres of land at 100 motor parkway, hauppauge, ny. tritec developed, constructed, and managed the 408,000 sq. ft. of space in two, six-story, class “a” office buildings. tritec sold 100 motor parkway in 2007, and 102 motor parkway in 2012 tritec’s asset management division continued to manage the property until 2017.
location
this office complex sits at the long island innovation park entrance, formerly the hauppauge industrial park. at over 17,000,000 square feet, this is the second-largest industrial park in the country. the buildings enjoy a prime location at the intersection of the long island expressway, long island’s main east/west highway, and the sagtikos parkway, a major north/south thoroughfare.
design and features
the twin buildings are six stories high and visible from the long island expressway. the architect chose an aluminum-framed reflective glass and granite facade to create a jewel-like upscale image. the windows allow an abundance of natural light to filter into the three-story lofty open atrium and tenant spaces. the atrium connects the lower level to the lobby up to the second floor in each building.
“to define each facility’s entryway, stone cubes of green granite with square glass punch windows interrupt the horizontal glass curtain wall,” says bill gallo, project manager of baldassano architecture (now bld architecture). baldassano (now bld architecture) designed an extremely efficient structure with a tight core and rectangular shape that allows flexibility to create office space for a wide range of various sized companies. the use of high-end materials and finishes creates a refined setting symbolizing strength and permanence.
upon completion of 102 motor parkway, the property received, at the time, the largest rebate checks in the long island power authority’s history. the buildings were included long island business news top 10 office addresses on long island.
“with our new offices, lab, and training facilities complete and delivered on time, we couldn’t be happier with the final result or the decision we made to partner with tritec.”
eppendorf north america, january 2010
saint anthony’s high school
saint anthony’s high school, located in south huntington, long island new york, began their relationship with tritec building company when they asked tritec to step in after a budget issue with the construction of their student center. the original contractor set a guaranteed maximum price of $27 million, days after financing for the project closed, the contractor submitted a revised estimate for $10 million more than their original 27 million dollar estimate. tritec was asked to step in as construction manager to reconcile the additional 10 million dollars and ensure the financing was deployed correctly. tritec re-bid the project and began the process of value engineering, reducing the scope and providing alternates, reducing the costs to 32 million dollars. tritec was able to complete the project for under 30 million dollars by aggressively buying out the project.
the student center for saint anthony’s high school is a multi-level, athletic and arts facility designed to be the crown jewel of the campus. the building is a pre-engineered steel structure with masonry, insulated metal panel, translucent panel, and glass curtain wall as the façade. the new exterior brick base matched the existing school building with metal panels above to reduce the building’s mass. the facility’s overall footprint is approximately 320 feet long by 220 feet wide with a clear ceiling height of 30 feet. the lower level features a sophisticated waffle slab concrete ceiling to accommodate the spans and the significant load from the features on the student center (main floor) level.
the student center was designed to have a separate entrance lobby and connecting gallery to the existing school. the program includes an indoor 200 m track and a turf with spectator seating. the building’s custom features and accommodations include multiple locker rooms, a wrestling room, choral rehearsal room, band rehearsal room, dance studio, and art studios. the facility replaces the school’s existing locker rooms and provides additional student features, including a concession facility, team store, athletic therapy and treatment accommodations, extra bathrooms, and storage. the student center has a tunnel that provides a dramatic entrance to the outdoor playing fields from the locker rooms on the lower level.
the construction of the facility took place during the school’s operational hours, with limited site mobility. the safety for all students and faculty were daily concerns addressed through tritec’s site safety and logistics plan, generated with the school’s administrative staff.
since the student center construction, tritec has completed work to the st. anthony’s high school science center. the science center project includes one modern chemistry room, one chemistry/microbiology room, one earth science/physics room, two multidisciplinary rooms, one marine biology room, the padre pio meeting room, and the saint francis hospital medical education lab. the friar quest research room, also a part of the science center, allows students to use new technologies to test advances in medicine and environmental studies. the new labs include oak casework, solid surface epoxy table tops, led lighting with occupancy sensors, smart board’s, experiment fume hoods, seamless epoxy floors, new hvac systems, new low e glass windows, vinyl wall covering, stained glass, mahogany wood paneling & new window treatments.
the stained glass in the padre pio room came from a church in new jersey, possibly a german parish circa. 1898 created by artist franz xaverzettler (1841-1916 ), who created the centerpiece in the padre pio room. zettler was a contemporary of louis comfort tiffany, and although he is not as well known, at the time, his art had the same prestige as tiffany. the smaller windows also use pieces cut from the same 13-foot tall window as the centerpiece. all of the windows were installed by somers stained glass to fit st. anthony’s requirements.
the 1,500 square foot saint francis hospital medical education lab for saint anthony’s high school was designed by nemschick silverman architects and anne lombardi designs.
before the renovation, the room was a slab-on-grade storage area. the purpose of constructing this room was to perform mock surgeries in a medical theatre using an anatomage table. the anatomage table is the most technologically advanced anatomy visualization system for anatomy education. many of the world’s leading medical schools and institutions use this technology. the table is featured in a tedtalks conference, on pbs, fuji tv, and numerous other journals for its innovative approach to anatomy presentation. the operating tables form factor combined with anatomage’s renowned radiology software, and clinical content separates the anatomage table from any other imaging system on the market.
to create the theatre effect, tritec removed the existing slab and excavated to create tiered seating levels. surgical lighting was essential to the design. tritec worked with saint anthony’s alumnus nick graci on the lighting system. the lights are capable of supplying millions of color combinations at low operating costs. retractable lighting positions allow the room to convert into an intimate theatre space by adding a section of backlights that retract into the ceiling. the theatre features a custom made vlt light panel to backlight the 8′ by 4′ somers stained glass window. the light panel features two-color temperatures that allow it to mimic the light of day and bring out the glass’s colors.
tritec also constructed the james c. metzger lacrosse field.
“this project team’s attention to detail, quality, cost and schedule were the reason for the success of this very complex project.”
brother gary cregan, osf, principal, saint anthony’s high school, march 2010
woodland pond
woodland pond, a continuing care retirement community in new paltz, ny, selected tritec building company as construction manager. the campus has 271 independent living apartments and 24 cottages on an 83-acre site with wetlands, ponds, walking paths, terraced landscaping and views of the catskill mountains. residents have on-site access to a full continuum of care, including assisted living, rehabilitation, skilled nursing and memory care. a 40,000 sq. ft. community building holds a pool, spa, formal and casual dining, a fitness center, a salon, billiards, banking and a post office. the project was completed in 2010. ehasz giacalone architects (now h2m) designed it.
tritec joined the team at 10% design to offer alternative building systems and value engineering through estimating and preconstruction, then set a guaranteed maximum price at 90% drawings.
john t. mather memorial hospital
tritec building company has completed more than a decade of construction on the campus of john t. mather memorial hospital in port jefferson, ny. the relationship began with the mather-st. charles hospital health alliance: tritec built jefferson’s ferry, a 420,000 sq. ft. continuing care retirement community completed in may 2001, and developed, built and financed the 120-bed island nursing and rehabilitation center at tritec’s exit 63 development, completed in april 2001.
on the hospital campus, tritec building company completed:
2004: physical therapy suite with private treatment areas, gym and whirlpool therapy
2007: mri suite housing a signa excite 1.5t hd scanner
2008: renovation of the cody surgical center: 10 operating rooms, recovery, a 12-bed icu, cystoscopy, endoscopy, pre-admission testing and pediatrics
2010: pharmacy (spring) and infusion suite (fall)
2011: emergency room modernization
the work was completed in an occupied, operating hospital, phased around patient care.
the family center for autism
tritec building company renovated a 110-year-old building in garden city, nassau county, for the family center for autism, an affiliate of life’s worc that supports people with developmental disabilities, including those on the autism spectrum. fusion architecture designed the 7,500 sq. ft. renovation, completed in 2015. life’s worc serves more than 1,200 individuals and families in queens, nassau and suffolk counties.
bringing a century-old building up to modern standards
the project began with a complete interior demolition. tritec building company then added a new elevator, upgraded the building’s infrastructure, and built out offices along with recreation, workout and therapy rooms, creating accessible, modern program space inside a building with more than a century of history.
healthcare and nonprofit construction on long island
the family center for autism is part of tritec building company’s healthcare portfolio, which includes:
north suffolk cardiology’s 17,684 sq. ft. renovation (2023)
the long island community hospital lobby renovation (2018)
bellport primary care center (2014)
sun river health patchogue
residence inn by marriott, holtsville
tritec building company built the 124-room, 84,000 sq. ft. residence inn by marriott in holtsville, ny, for schleicher-stebbins (s&s) hotels. it was the first wood-framed hotel of its kind built after suffolk county amended its building code. the four-story hotel uses a panelized frame system with cement-board siding, and tritec installed an 18,000-gallon-per-day on-site sewage treatment plant. pci architecture designed the hotel.
with a tight budget and just 11 months to build, tritec helped guide the owner through the town and suffolk county approval process. the hotel opened on time and under its guaranteed maximum price in may 2004, and the owner hired tritec to build a second long island hotel, the hampton inn in holtsville.
“we had a tight budget and only 11 months to complete the 124 room hotel in a challenging entitlement and oversight environment. the tritec team was instrumental in shepherding us through the complex approval process with the town and suffolk county. we are thrilled that we opened on time and under the gmp.”
mark stebbins, managing member, schleicher-stebbins hotels, july 2004
residence inn by marriott, yonkers
tritec building company was construction manager for the 144-room, 92,000 sq. ft. residence inn by marriott in yonkers, ny, completed on schedule in august 2009 for true north hotel group. tritec began preconstruction at 50% drawings. group one architects designed the four-story hotel, about 20 minutes from new york city.
amenities include an indoor pool, reading library, market, conference room, dining area, outdoor fire pit, sport court and putting green.
smsc
smsc is a global supplier of integrated circuits and semiconductor software solutions for high-speed computing, connectivity, automotive, and embedded networking applications. smsc builds its business through innovation while maintaining high standards of quality.
before undertaking the construction and renovation of their existing headquarters, smsc insisted that the team hired to design and build their new facility would reflect their corporate culture of creativity, innovation, and quality by creating a world-class headquarters and test facility. after a rigorous rfp process, smsc hired tritec building company as the design-builder, construction manager for the project.
smsc’s corporate headquarters sits on 10 acres in the long island innovation park, formerly known as the hauppauge industrial park. when first built in 1979, the building was approximately 80,000 square feet. the facility that exists today has undergone a complete renovation and has expanded on both sides. the expansion included a 106,200 square-foot, two-story office addition, a training facility and cafeteria at the west side of the existing building, and a 13,800 square-foot shipping and receiving area on the east. the new facility’s construction consolidated more than 400 employees into one facility, who had previously been working between two buildings in the industrial park. the master planning of the expanded facility also provided room for the companies future growth. with smsc operating continuously, 24 hours a day, seven days a week, tritec’s project staff had to ensure that disruption was minimal. tritec and the design team worked extensively with people from each division of smsc to incorporate their vision into the design, phasing construction around each department’s operational objectives.
preconstruction on the facility began in october of 2003. the tritec team broke ground on january 8, 2005. construction started on an intense 16-month schedule with the addition of the new loading area adjacent to smsc’s vibration-sensitive testing floor. once the loading area was complete, receiving operations were moved from the existing west end location to the new east end addition and work on the substantial west end addition began. to maintain a safe environment with no significant downtime for smsc employees, the tritec team worked from the point furthest west, leaving an existing access road open until a new entrance on the east could be complete. once the new access road was completed, the old access road was closed, and the west addition was married to the existing building. the west addition included a 22,000 square-foot, 15-foot deep basement. while the basement was under construction, the old west end receiving area and warehouse was converted to office space; all 13 existing bathrooms were renovated. to maintain schedule and budget, tritec mobilized two operations, bringing a second job superintendent onto the site—one for interior renovations and the other focusing on out-of-the- ground construction. in may 2006, smsc’s employees moved into the new facility.
the project’s success can be attributed to a proper preconstruction plan, early procurement of long-lead items, and the smsc-tritec project team’s dedication. all pre-manufactured materials needed for the project—from doors to rooftop hvac units— were ordered asap. these pre-purchased items were stored on-site and available when needed to avoid significant time gaps in the project schedule.
the finished project boasts a beautiful interior with soaring three-story atrium accented by rich mahogany and gorgeous granite. the atrium spans 225 feet from front to back and is 45 feet high. skylights run the central corridor’s length, and functional walking bridges add architectural drama to the entryway.
this project won the cmaa new york area chapter project of the year for 2007.
“from our initial introductory meeting to the present, i have felt that tritec is an organization that has assembled a group of professionals to deal with every aspect of a building project. they have a positive ‘can do’ attitude at all times.”
francis g. postel, divisional vice president, facilities, smsc, august 2005
ufcw local 1500
tritec building company, as construction manager, built this ground-up development of a two-story structure with a full basement that is partially exposed. ufcw local 1500 new office building is located at 425 merrick avenue on a two-acre site in westbury, long island, new york. the building exterior is designed with a modern look, comprised of dryvit and brick, and features a glass curtain wall. significant grade changes forced ufcw to add an engineered retaining wall that runs the north side of the buildings.
the building’s interior meets the needs of the owner, including conference rooms, large training rooms with partitions, and bullpen space. when you enter the building, you walk into a large two-story atrium flanked by mahogany wood panels that add an elegant touch to the glass and ceramic tiles that make up the rest of the space.
the building had a nine-month construction schedule that was completed on time within the owner’s budget, and the union moved in on december 6, 2010.
“these three gentlemen made it much easier than we had anticipated; issues were resolved promptly, problems were thoroughly explained and honest assessments and suggestions were always given.”
bruce w. both, president, ufcw local 1500, february 2011
tower fasteners
tritec building company was construction manager for a renovation of tower fasteners’ 15,000 sq. ft. headquarters and warehouse in holtsville, ny, completed in september 2008. the work began with the building’s infrastructure, including a complex masonry repair that replaced more than 1,000 sq. ft. of brick façade. tritec then renovated the lobby, common areas and executive offices in phases. wfc architects designed the project.
as the job progressed, the client expanded the scope to include painting the entire warehouse, upgrading the conference room and the employee and executive lounges, and adding millwork panels throughout the building. tower fasteners stayed open the whole time, and the project was completed without incident.
the racing forum
suffolk regional off-track betting corporation wanted a destination for racing fans in suffolk county, and the racing forum in hauppauge, ny, became the flagship of its locations. tritec building company served as owner’s representative, overseeing design, budget and bidding, and then managed construction on site. the baldassano architectural group (now bld architecture) designed the 14,000 sq. ft. building, which was completed in march 2000.
the wagering facility has a state-of-the-art simulcast system with 33 monitors, a restaurant and a bar. its exterior borrows from saratoga’s adirondack style.
“the suffolk racing forum stands complete as a magnificent architecturally designed state-of-the-art racing facility… structurally sound and visually splendid, this fully functioning building is a testimony to your individual professionalism and tritec’s stature in the field of construction management.”
william a. majuk, director of facilities development, suffolk regional otb, june 2001
tallgrass golf club
tritec building company was construction manager for the delalio family’s 7,500 sq. ft. clubhouse at tallgrass golf club in shoreham, ny, completed on time and on budget in 2001. tritec’s value engineering, redesign and handling of the permit process kept the project on track. ward associates designed the building.
the cedar-shake, steel-framed clubhouse has wood roof trusses and a basement for cart storage, with controls for off-peak cart charging to cut electricity use. inside are a full-service kitchen with walk-in coolers, a full bar in the dining room and restaurant-quality finishes.
“our project was completed on time and, above all, on budget. the clubhouse project was especially assisted by your value engineering and redesign, as well as your handling of the permit process.”
janice delalio mcclellan, vice president, delalio sod farms, december 2001
179 belle mead road
179 belle mead road is a 14,660 sq. ft. medical office building in the stony brook technology center in east setauket, ny, minutes from stony brook university hospital. tritec development group developed the land and infrastructure for the technology center and sold this parcel to dr. adler of suffolk plastic surgeons. tritec building company served as general contractor and construction manager for the building, designed by hoffman grayson architects, completing the core and shell in june 2002 under a fixed-fee contract with a guaranteed maximum price (gmp).
built for medical tenants
tritec building company then fit out both tenant spaces: 8,660 sq. ft. for suffolk plastic surgeons, a 25-room surgical practice completed in 2003, and the remaining 6,000 sq. ft. for neurology associates.
a relationship of more than 20 years
tritec’s work with suffolk plastic surgeons didn’t end at move-in. more than two decades later, tritec asset management relocated the practice to 24 research way, which tritec manages, and the new office celebrated with a ribbon cutting in november 2026. it is a clear example of how tritec’s three divisions serve a medical practice over the long term, from site and construction through management.
the stony brook technology center
tritec development group developed the land and infrastructure for the stony brook technology center in east setauket, and all three tritec divisions have worked there since: preparing sites, constructing buildings and tenant spaces, and managing properties for medical, technology and office users.
suffolk county national bank
tritec building company was general contractor for suffolk county national bank’s 3,700 sq. ft. branch at hauppauge square, at the corner of arkay drive and marcus boulevard in the hauppauge industrial park. the branch opened on schedule on may 22, 2003, with a formal opening that june, and came in within the bank’s budget. gary jacquemin, aia, was the architect.
the branch features high-end architectural woodwork and trim and a 50-foot vaulted ceiling with accent lighting. tritec coordinated all of the bank’s own millwork, atm, security and cctv systems.
“thanks to tritec’s ability to produce an excellent product and meet schedules, the bank will be opening our new branch on time… thank you for delivering what you promised!”
augustus c. weaver, executive vice president, the suffolk county national bank, may 2003
stony brook university obstetrics and gynecology
tritec built stony brook university medical center’s satellite obstetrics and gynecology office in suite 140 of 4 technology drive, in the stony brook technology center in east setauket, ny. tritec development group developed the space, tritec building company built it, and tritec asset management manages the building. monastero architecture designed the 3,352 sq. ft. office, completed in may 2010.
the practice offers general gynecology and obstetrics, reproductive endocrinology, maternal-fetal medicine, high-risk obstetrics, urogynecology and midwifery. the office has multiple exam rooms and a procedure room, laid out for a multidisciplinary care team.
stafford associates
stafford associates, dr. eugene f. stafford building, is a data center and office building located at 21 bennetts road in setauket, long island, new york. the facility received a leed gold certification.
leed elements incorporated into the building include but are not limited to:
rainwater collection for site irrigation – lowers the buildings demand for potable water20% + of the site left as open space – help maintain habitat for the natural ecosystemimplementation of construction waste management plan –encourages the reuse & recycling of construction waste & keeps useable material from the landfilltighter building envelope and innovative building systems –approximate 30% less energy use and carbon footprint thantypical building constructionrecycled content in building materials – reduces the need for virgin materials and associatedenvironmental costslocal/regional building materials – supports localeconomy while minimizing the impact of transporting materials to the site
the building itself is approximately 50,000 sq. ft., two stories plus a basement, and has many residential qualities to give clients, tenants, and employees the sense that they are working with a family-owned business. the building, adorned with rich earth tones and natural materials, like the black marble steps with orange veins, mahogany, deep brown accented carpets, and natural wall coverings. craftsmanship and high technology are infused throughout the building from the handcrafted railings in the atrium to the tier 3 data center that boasts concurrently maintainable site infrastructure, guaranteeing 99.982% availability.
tritec also restored the post–civil war house on the property for professional office use, completed in 2011.
“we could not be more satisfied relative to tritec’s performance… tritec has been able to save us thousands through their suggestions that never sacrificed quality or security just to save a buck.”
eugene f. stafford, ph.d., vp and cfo, stafford associates, march 2010
st. matthew roman catholic center
tritec building company was construction manager for a two-story, 30,000 sq. ft. parish center addition for st. matthew roman catholic church in dix hills, ny, completed in april 1999. the center has large classrooms, a prayer room with stained glass windows, a gift shop, a gymnasium and auditorium that can be divided, a library, a dance studio, built-in display and trophy cases, and administrative offices for the parish. the baldassano architectural group (now bld architecture) designed it.
tritec field superintendent kevin woods ran the site and coordinated the trades, the builder and the parish through completion.
“on behalf of the parish community of st. matthew, i would like to commend the expertise, cooperation, dedication and loyalty which mr. kevin woods demonstrated in building and coordinating our recently completed parish center.”
msgr. saverio c. mattei, pastor, st. matthew roman catholic church, june 1999
warren tricomi salon
tritec building company was general contractor for the warren tricomi salon in downtown greenwich, ct, completed in may 2003. the 7,500 sq. ft. space combines a full-service upscale salon with a luxury shop selling beauty and hair products, accessories and gifts. dmac architects designed it.
the salon is an interior renovation of a historic landmark building, spread over three floors including two mezzanines, and the new design required extensive structural and framing work. new systems include 600-amp electrical service, 33 tons of air conditioning, a large exhaust system and an extensive plumbing network. finishes include venetian plaster walls and ceilings, corian millwork tops and cabinets, stainless steel and glass railings and epoxy floors.
westbury partners at 100 motor parkway
tritec built 4,400 sq. ft. of offices for westbury partners, a private equity firm, on the top floor of 100 motor parkway in hauppauge, ny, completed in december 2007. tritec developed the building, built the space and managed the property. the baldassano architectural group (now bld architecture) designed the offices.
the lavishly appointed suite features cherry wood panels, aluminum and frosted glass, bamboo flooring and vinyl wall covering.
st. ignatius school
tritec building company was construction manager for an addition and renovation at st. ignatius school in the hunts point section of the bronx, ny. tritec built a new 10,000 sq. ft. third floor on top of the existing school, replacing the roof, relocating three rooftop units and adding a new one, and extended the elevator to serve the new level. the work also renovated parts of the cellar, ground and second floors and updated infrastructure on the lower floors. a new entrance has a granite tile foyer with traction-inlay steps and an accessible lift to the classrooms and roof. perkins eastman was the architect.
st. dominic high school
tritec building company renovated a 60-year-old 19,000 square foot convent at st. dominic parish, in oyster bay, long island, new york, to a modern science and technology center.
renovations to the convent include six (6) new science labs with prep rooms, a virtual classroom, chemical storage rooms, offices, and nine (9) new restrooms. the chapel was converted to a sound studio, and the terrace made into a greenhouse. a reflection room was constructed on the third floor, showcasing the chapel’s original stained glass windows and light fixtures. an elevator and a handicap ramp were added to the building connecting the new sound studio with the school. all of the new classrooms have a rubber floorcovering with cold weld seams, and the corridors have cork rubber flooring for noise control. exterior building enhancements include new structural steel framed awnings with translucent kalwall roof panels constructed at three entrances.
tritec installed three high-tech condensing furnaces and a water heater, run on a new building management system. a chiller and rooftop air handling units supply new fan coils and unit ventilators throughout the building. tritec upgraded the utility service including, new switchgear for the electric service, lightning protection, fire alarm control panel, water main, and rpz. a fire sprinkler system with double check valves was installed throughout the entire structure.
springhill suites by marriott, carle place
tritec building company was construction manager for the 120-room springhill suites by marriott in carle place, ny, a ground-up hotel completed in april 2016 for avr realty company. it sits next to homewood suites carle place, which tritec also built for avr. james l. browning designed the hotel.
suites have separate areas for relaxing, working and sleeping, with sliding barn doors to the bathrooms and a touch-screen concierge in the lobby. amenities include an indoor pool with enclosed sun deck, fitness area, meeting room, dining area and outdoor fire pit.
stony brook technology center
in the 1970s, robert t. coughlan had the vision to create a university-related research park to encourage businesses and jobs created by the state university of new york at stony brook campus to stay near the university. the 103-acre technology park became a planned development to provide space for companies and medical/technology groups looking for a campus environment in proximity to the medical center at stony brook and the university at stony brook. the university is the only public research university in new york state to be designated as a national science foundation science and technology center, and as a type i research institutions by the carnegie foundation. university hospital at stony brook is suffolk county’s only level 1 trauma center, tertiary care center, and is recognized as one of the top 15 teaching hospitals in the u.s.
the stony brook technology center (sbtc) was developed over 20 years with varying architectural styles for each building but a unified campus-like environment remains throughout the park. in place of sumps, retention ponds with fountains are scattered across the park, providing a beautiful natural appearance. the streets are curved to break up the line of sight to avoid a more rigid and industrial atmosphere. setbacks are strongly enforced to create much more green space and provide the park with a more manicured appearance. sidewalks were implemented throughout the entire park. the campus shuttle service from the sbtc to health science facilities of stony brook university runs through 16 times daily.
sbtc is the only industrial/commercial development with sewer capacity close to the university at stony brook. tritec accomplished this by establishing the town of brookhaven sewer district #1. tritec fully managed the project from the conceptual approval of the suffolk county sewer agency through the approvals by various governmental agencies, including special legislative approval from the new york state assembly, ny state environmental facilities corporation (efc), town of brookhaven, and the suffolk county legislative certificate of necessity. construction on the sewer was completed in november of 1995.
the sbtc is now fully built out with over 1 million square feet in 28 buildings. tritec manages many of the buildings in the park.
saab of greenwich
tritec building company renovated the saab of greenwich dealership in downtown greenwich, connecticut, inside and out for oceanside ventures, completing the work in february 2002. cpg architects designed the renovation.
keeping a dealership open during construction
a dealership earns its revenue every day on the showroom floor and in the service bays, so closing was not an option. tritec building company phased the work so sales and service continued normally from start to finish.
scope of work
new showroom
curved glass-block storefront
eifs façade
tapered epdm roof
ada accessibility upgrades
custom millwork
new floor, wall and ceiling finishes
landscaping
retail and dealership experience
saab of greenwich is one of several tritec building company projects in greenwich, along with richards of greenwich and the warren tricomi salon. on long island, tritec has renovated occupied dealerships including life quality bmw, which stayed open throughout construction, and hassel bmw.
rockville links golf club
tritec building company provided project preparation and construction management for the renovation of rockville links golf club in rockville centre, ny, completed in april 2007. tritec interviewed and hired the design team, coordinated the owner’s program, set the budget estimate and built the project. d3 architecture was the architect.
the 10,000 sq. ft. main clubhouse received an interior and exterior renovation, expanded common areas, ada compliance between public and private spaces, new finishes and all-new mechanical, electrical, plumbing and fire protection systems. the pro shop was rebuilt inside and out, with pitched roofs and columns that reflect the original farm building.
richards of greenwich
tritec building company led richards of greenwich, the mitchell family’s luxury clothing store on greenwich avenue in greenwich, ct, from concept through land acquisition, design, permitting and construction. the site is bounded by streets on three sides and existing buildings on the fourth, and tritec blasted and removed rock to a depth of 30 feet for two levels of below-grade parking (48,000 sq. ft.) beneath 27,000 sq. ft. of retail on the street level and second floor. the store opened in september 2000, ahead of schedule. herbert s. newman and partners was the architect.
finishes include imported stone and marble walls and floors, venetian plaster, herringbone wood floors, splayed ceilings, a glass elevator, handcrafted iron stair rails and extensive millwork. richards won store of the year for 2000 at the retail design awards of the national association of store fixture manufacturers and vm+sd magazine. tritec returned in 2002 to build the store’s armani black shop.
“it was a pleasure working with tritec, a group totally committed to high quality work and who ‘can get the job done’ under exceptionally tight time constraints.”
errol spence, vice president of projects and production, fitzpatrick design group, may 2001
people’s united bank at 100 motor parkway
tritec building company was general contractor for 21,500 sq. ft. of office interiors at 100 motor parkway in hauppauge, ny, built for the bank of smithtown and completed in december 2004. when people’s united bank acquired the bank of smithtown, it made the space its long island regional headquarters. mojo stumer associates designed the space.
the space has a fully automated boardroom, conference rooms with audio-visual systems and a 1,200 sq. ft. data center that runs all bank operations, with raised flooring, fully redundant hvac, ups and generator backup, and an fm-200 fire suppression system. precious woods and steel details give it a warm, contemporary feel. tritec asset management managed the building from 2004 to 2017.
orthopedic associates of long island
orthopedic associates of long island (oali) aims to provide the highest quality, comprehensive orthopedic and musculoskeletal care to patients throughout long island and particularly suffolk county. oali offices are located in 6 technology drive, a building developed, constructed, and managed by tritec.
tritec acted as the construction manager for the medical office renovation and expansion of orthopedic associates of long island. the renovation included interior demolition, structural, carpentry, finishes and mechanical, electrical, and plumbing modifications to the lower floors of the building. the mri suite required considerable structural changes to support the weight of the new machine. the first-floor concrete decking removed from the entire mri room, and structural steel was put in place to hold the weight of a new 12” thick concrete slab. (six new columns were installed in the basement. the columns required a more substantial footing to cut into the basement slab.) a 10’ x 10’ roof hatch had to be installed so the mri could be swung in by crane. install the roof hatch that necessitated two 40’ long steel beams to be placed into the existing steel roof structure. the hatch will remain in place in case anything ever happens to the mri, and it has to come out. the installation of the new columns and beams required the relocation of existing infrastructure, which included electrical lights, conduits, panels, water main, fire sprinkler mains and heads, and it wires. because the job required a significant amount of saw cutting and structural work, it was done during off-hours not to disturb the existing tenants. during all other phases of demolition and construction, oali remained open.
the construction results include dozens of new workstations in the lower level, new exam rooms, and a new mri suite. the lobby for the mri suite was beautifully appointed with wood finishes and red accent walls.
north fork bank branch
tritec building company was construction manager for a 3,400 sq. ft. north fork bank branch in port washington, ny, completed in november 2003. the existing building was taken down to its steel skeleton and rebuilt with light-gauge framing and metal trusses, cement board siding, cultured stone, andersen windows and doors, and epdm and shingle roofs. jrs architect designed the branch.
inside, the branch has an elaborate coffered ceiling, a cherry teller line and paneling with granite tops, and quarry tile and carpet floors. site work included new drainage, a new parking lot, site lighting, irrigation and landscaping.
nassau otb race palace
tritec building company was general contractor for the race palace, nassau regional off-track betting’s 65,000 sq. ft., three-story horse racing and sports entertainment center in plainview, ny, completed in june 2004. the renovation took the building down to its interior shell, replaced all mechanical, electrical and plumbing systems, added two elevators serving the wagering floors and installed an extensive pneumatic tube system. elias design group was the architect.
the wagering floors have betting stations and self-service betting machines, a full bar, a private glass-enclosed vip room, theater seating for sporting events, party rooms and lounges, with flat-screen monitors and projection screens visible from every seat. finishes include cherry and maple woodwork, granite counters, carpet, ceramic tile and stainless steel railings.
mitchell’s of westport
tritec building company renovated mitchells, the mitchell family’s flagship clothing store in westport, ct, completing the work in september 2003 on schedule and while the store stayed open throughout the nine-month job. the 31,000 sq. ft. interior was demolished and rebuilt in phases, with new designer shops including giorgio armani black, hermès, tod’s, prada, polo, zegna and hickey freeman. r. ceretti associates designed the remodel.
tritec reworked the roof structure to open two large clerestory skylights over the main floor, excavated 4,000 sq. ft. beneath the store for a sliding storage rack system, and replaced the façade with thin brick, stucco, storefront glass and metalwork. interior finishes include imported stone walls and floors, venetian plaster, herringbone wood floors, splayed ceilings and extensive millwork. site drainage, landscaping and parking were also upgraded. tritec first worked for the mitchells in westport in 1994 and went on to build richards of greenwich and marsh’s of huntington.
“your dedication to the job helped get this project done on schedule and your devotion to the profession made a difference where it counts, in the details.”
anthony j. simon, r. ceretti associates, september 2003
marsh’s of huntington
tritec building company was construction manager for the complete rebuild of marsh’s, the mitchell family’s 16,000 sq. ft. luxury clothing store in huntington, ny. over the years the store had grown into a group of connected buildings, and tritec gave it a new façade and interior while it stayed open through an eight-month, six-phase schedule. the store was finished in october 2006, in time for the holiday season. hoffman grayson architects designed the project.
tritec’s project prep service guided the job from the start: setting up the project, interviewing architects and engineers, mapping the approvals process, and building the schedule, program and budget. marsh’s was tritec’s fourth project for the mitchell family, after mitchells of westport, richards of greenwich and vineyard vines in greenwich.
“the added issues of the site conditions, and keeping the store open while it was being totally rebuilt, really required some head scratching, and coordination… tritec’s approach is the most professional that we have been involved with in the 25 years we have been in business.”
neal hoffman, aia, hoffman grayson architects, july 2006
marriott residence inn, hauppauge
tritec building company was construction manager for the 100-suite marriott residence inn in the hauppauge industrial park, completed in april 2002 for the briad group. tritec joined at 10% drawings to provide building-system alternatives and value engineering, and a guaranteed maximum price was set at 90% drawings. pci architecture designed the 69,000 sq. ft. extended-stay hotel.
the shell uses a modular structural metal stud system with metal roof trusses. a 15,000-gallon-per-day chromaglass sewage treatment plant serves the site. amenities include a fitness center, indoor pool and spa.
life quality bmw
tritec building company completed a major renovation of life quality bmw’s 50,000 sq. ft. dealership in brooklyn, ny, in december 2008. the work covered two existing service centers, including relocating the dealership’s audi service center, and added 19 new service bays with a full replacement of the building’s mechanical, electrical and plumbing systems.
the renovation also delivered a new parts department, rooftop parking with a new access ramp, a new-car delivery area, new offices and a new showroom, all while the dealership kept selling and servicing cars. d3 architecture designed the project.
la quinta inn & suites by wyndham, bohemia
tritec building company was construction manager for the 132-room la quinta inn & suites by wyndham in bohemia, ny, the first la quinta built on long island. the 70,000 sq. ft. limited-service hotel near long island macarthur airport was completed in june 2006 for applecore hotels. tritec joined at 10% drawings to provide building-system alternatives and value engineering through preconstruction.
tritec also built the 15,000-gallon-per-day on-site sewage treatment facility that serves the hotel. amenities include meeting rooms, a spa and fitness facilities. the baldassano architectural group (now bld architecture) designed the hotel.
island nursing and rehabilitation
tritec developed, built and financed the 120-bed island nursing and rehabilitation center in holtsville, ny, for the mather-st. charles hospital health alliance. under a design-build contract, tritec coordinated design, permitting, financing and construction management for the 81,000 sq. ft. facility at its exit 63 development, completed in april 2001. ehasz giacalone architects (now h2m) was the architect.
the three-story nursing building and attached administrative wing use a steel frame and metal stud shell with brick veneer and dryvit finishes. it includes a medical gas system, resident and family lounges, a beauty parlor, a patio, a dining room and a full kitchen. a sewage treatment plant was built on the 20-acre subdivided lot, and tritec asset management managed it for the exit 63 development until 2015, when tritec sold the last of the land to engel burman. the project ran alongside tritec’s work on jefferson’s ferry for the same alliance.
intercounty appliance corporation
tritec building company built a 75,000 sq. ft. expansion of intercounty appliance corporation’s warehouse and distribution center in medford, ny. the addition is a steel-framed building with 28-foot clear height and precast insulated wall panels. skylights and motion-sensor lighting cut the warehouse’s electricity use for lighting. tritec finished the project on schedule and within budget. monastero architects designed it.
homewood suites, carle place
tritec building company was selected as construction manager to construct homewood suites by hilton – carle place garden city, ny, located in carle place, ny.
nestled in the more than 200-year-old hamlet of carle place, this homewood suites took its character from the nearby residences. the building was new construction built on an undeveloped automobile storage yard. the four-story building facade was built out to give the building stepped dimensional appeal. the façade features a natural pallet of two-tone efis panels, stone veneer, and oiled brass metal accents. the exterior lighting make the hotel especially inviting toguests as it begins to get dark.
the hotel features 150 guest rooms where patrons settle into a comfortable studio, one or two-bedroom suite with homelike amenities, including a full kitchen. the lobby and guest rooms feature a mix of modern and vintage styles in a warm color pallet and retro lighting. the dining area, outdoor fire pit, and putting green allow guests to eat, rest and recharge during their stay. guests can take advantage of the indoor pool and whirlpool, a reading library, market, and 1820 sq. ft. of meeting space.
tritec was brought on at 90% drawings and established a gmp. the project was completed under budget and ahead of schedule.
holiday inn express, riverhead
tritec building company was general contractor for the three-story, 60,000 sq. ft. holiday inn express in riverhead, ny, completed in november 2005 for jaral riverhead corp. the hotel has 89 rooms and 39 suites, plus a fitness room, breakfast bar and two conference rooms. ronald schmidt associates designed it.
tritec built the hotel with a structural metal stud framing system and precast plank decks. the façade pairs cultured stone with eifs for a durable, energy-efficient exterior.
holiday inn express, hauppauge
tritec building company built the 133-room holiday inn express in hauppauge, ny, completed in march 2002 for hauppauge hotels, llc. the seven-story, 75,000 sq. ft. hotel used a prefabricated structural metal stud framing system with precast plank decks, letting tritec erect one floor every eight days. the prefabricated exterior panels for the whole building went up in 30 days. bha architects designed the hotel.
amenities include a fitness center, heated pool and large meeting rooms. an on-site chromaglass system treats sewage discharge.
hilton garden inn
tritec building company was construction manager for the 140-room, 83,000 sq. ft. hilton garden inn in westbury, ny, built for the briad group. it was the first hospitality project on long island to use a wood-framed, panelized construction system for a four-story structure. pci architecture designed the hotel, with a façade of cement-board horizontal siding, thin brick and eifs.
western suffolk boces
tritec development group secured the land and tritec building company built a 24,000 sq. ft. aviation education facility for western suffolk boces on the grounds of republic airport in farmingdale, ny. the building combines an aircraft hangar with classrooms where students train in airplane maintenance, plus administrative offices and lab space with an overhead bridge crane. tritec used fast-track design-build to meet boces’s schedule and budget, completing the facility in 1999. the baldassano architectural group (now bld architecture) designed it.
head injury association
tritec building company was general contractor for the head injury association’s 30,000 sq. ft. facility in hauppauge, ny, completed in december 2011. fusion architecture designed the space around the needs of people living with brain injuries.
the signature feature is a high-sheen epoxy floor with a wave-like fresco pattern, echoed by curving light fixtures overhead. the layout and finishes were tailored to the association’s clients and the programs it runs.
hassel bmw
tritec building company was construction manager for hassel bmw/mini’s three-site expansion in freeport, ny, completed between september 2005 and january 2006. the centerpiece is a new bmw service center at 100 cleveland avenue: a 60,000 sq. ft. former school, later a shelving manufacturing and distribution center, that tritec converted under a modified design-build contract. tritec split the 35-foot-high warehouse with a new mezzanine, giving the dealership a ground-floor service area and an upper level to hold cars waiting for service. harold e. gebhardt was the architect.
with service moved out, tritec converted the 17,500 sq. ft. bmw dealership’s former service area into sales and showroom space and remade the exterior to bmw’s corporate standards. the third site, the 7,500 sq. ft. mini dealership, got a new façade to mini’s standards. value engineering throughout kept the program on schedule and under budget.
“this was a modified design build project. there were many variables and many uncertainties all of which you and your team worked with me and my team to resolve in a cost effective and practical way.”
frank d. dellaquila, owner, hassel bmw/mini, august 2005
hampton inn, holtsville
tritec building company was contractor for the 160-room, six-story hampton inn in holtsville, ny. the 110,000 sq. ft. hotel was built with modular units prefabricated off-site, each containing two guest suites and a corridor section. the modules were set on a conventional concrete foundation, with structural steel on the first floor only. bha architects designed the hotel. it was the second long island hotel tritec built for schleicher-stebbins (s&s) hotels, after the residence inn by marriott in holtsville.
hampton inn, garden city
tritec building company built the 143-room, 84,000 sq. ft. hampton inn & suites in garden city, ny, completed in september 2006 for oto development. tritec joined at 10% drawings to provide building-system alternatives and value engineering through preconstruction, and a guaranteed maximum price was set at 90% drawings. stv architects designed the hotel.
challenging subsurface conditions required fully engineered under-slab soils. despite the setback, tritec delivered the hotel on time.
4 technology drive
developed by tritec development group in 2008, 4 technology drive is a 40,125-square-foot, two-story class a medical office building located within the prestigious stony brook technology center. strategically positioned with visibility from nesconset highway (nys route 347), a major east-west corridor on long island, the building offers both prominence and accessibility for medical professionals and patients alike.
constructed by tritec building company, the building features a modern exterior of glass, brick, and efis panels, while the interior is finished with stone flooring tiles, a stack stone accent wall, and wide, well-lit corridors that lead to multiple high-end medical suites. the building was thoughtfully designed as a multi-tenant facility, with attractive lobbies and ample surface parking to accommodate both staff and visitors.
the building’s floor plate is 20,062 square feet, and it includes an additional 20,000 square feet of storage space on the subterranean concourse level, offering flexibility for tenant needs.
following its development, tritec sold several suites as medical office condominiums, while retaining ownership of two prime spaces:
suite 250: 7,819 square feet
suite 140: 3,123 square feet
these remaining suites are available for lease or sale, offering a rare opportunity to join a thriving medical community in a professionally managed, class a environment.
4 technology drive is located within 4 miles of three major hospitals, including stony brook university hospital, mather hospital, and st. charles hospital, making it an ideal location for healthcare providers seeking proximity to leading medical institutions.
tritec asset management oversees the property, ensuring high standards of maintenance and tenant service.
maria valanzano and steven d’orazio of colliers represent tritec at this property and are available to discuss leasing or purchase opportunities.
flight 800 memorial
the crash of twa flight 800 off long island’s south shore in 1996 took 230 lives. tritec building company donated its construction management services to the families to build the twa flight 800 international memorial at smith point county park in mastic beach, ny, which opened in 2002. tritec managed the project through final design, construction and delivery, working through difficult site selection and site preparation with care for the families throughout. the goal was a memorial with the dignity the loss called for, delivered without delay. busch associates was the architect.
for tritec, the memorial reflects a core belief: serving the public and helping people through tragedy is part of being a good citizen and doing business in a community.
“we appreciate that this project presented very unique and significant challenges, and are grateful to you for your considerable expertise, your quiet professional strength, and your steadfast commitment.”
john j. and eleanor l. seaman, families of twa flight 800 association
five towns college dormitories
tritec building company was construction manager for 96,000 sq. ft. of student housing at five towns college’s 33.6-acre campus in dix hills, ny. the multi-phase project built four 24,000 sq. ft. residence halls for 208 students, in wood-frame and masonry construction designed to fit the surrounding residential neighborhood, with the final buildings completed in september 2004. working with the baldassano architectural group (now bld architecture), tritec held costs to the college’s budget through value engineering and close design coordination.
when a possible stop-work order threatened a long delay mid-project, tritec’s field team weatherproofed the work in place before the order was served, protecting the college’s investment until work could resume.
“our residential life project clearly presented numerous challenges during the design and construction phases. in each instance, the project team met the issues head on and moved forward.”
david m. cohen, dean of administration, five towns college, may 2002
first empire securities at 100 motor parkway
tritec building company built the 27,000 sq. ft. corporate headquarters of first empire securities, a full-service securities firm, at 100 motor parkway in hauppauge, ny, a building tritec developed, built and managed. the high-end interior fit-out was completed in march 2004. the spector group was the architect.
the trading floor has stand-alone furniture with indirect lighting, supplemental air conditioning and a trading desk with a 30-foot active ticker. two main conference areas support video conferencing and projection. executive offices feature fabric wallcovering, bordered wool carpeting, built-in cherry millwork, granite bars and wall-hung plasma screens.
exit 63 development
in the 1990s, tritec development group began purchasing undeveloped land at intersections along the long island expressway (lie). the lie is the most heavily traveled road on long island connecting eastern long island with manhattan and hosts hundreds of thousands of cars aday. as part of the program, tritec purchased 20 acres at the northwest corner of exit 63, where the lie meets north ocean avenue. tritec’ development group developed exit 63 as a planned mixed-use commercial development in holtsville, long island, new york. the infrastructure was developed concurrently with each corresponding parcel of the site. the 70,000 gallons per day sewage treatment plant constructed on-site allowed for the development of multiple facilities.
the first building to be completed was the kindercare learning center part of a national chain of childcare facilities. tritec completed a design-build for a 120-room extended care facility, island nursing and rehab center, for the mather-st. charles hospital health alliance. later a 168-room six-story hampton inn was constructed for a long island-based hospitality company. the last 6-acre parcel was sold to engel burman in 2015 for the bristal, a 145-bed assisted living community. tritec operated the on-site sewage treatment plant until that sale.
eppendorf north america at 102 motor parkway
eppendorf north america, a global maker of laboratory instruments and consumables for the life sciences, moved its north american headquarters to 102 motor parkway in hauppauge, ny, one of the twin class a office buildings tritec developed, built and managed. tritec building company fit out 10,000 sq. ft. on a previously unoccupied floor on a very tight schedule, completing the offices, lab and training facilities in december 2009.
the lab is equipped for eppendorf to train customers in liquid handling, lab automation, molecular biology, microinjection, icsi, microarrays, pcr and real-time pcr (qpcr). the baldassano architectural group (now bld architecture) designed the space.
“with our new offices, lab, and training facilities complete and delivered on time, we couldn’t be happier with the final result or the decision we made to partner with tritec.”
eppendorf north america, january 2010
dr. gerard furst
tritec built dr. gerard furst’s 3,800 sq. ft. podiatry office in suite 110 of 4 technology drive, in the stony brook technology center in east setauket, ny. tritec development group developed the building, tritec building company built the office, completed in september 2009, and tritec asset management manages the building. baldassano architectural group (now bld architecture) designed the space.
the office is laid out for patient flow, with high-end finishes, intricate color patterns, wall coverings and millwork meant to make patients feel comfortable during their visit.
dove electronics
tritec built an expandable headquarters for dove electronic components, a distributor of frequency-control electronic components, at the stony brook technology center in east setauket, ny, the research park tritec developed. the 15,000 sq. ft. building holds executive and sales offices and a distribution center, and it was planned so it could expand as the company grew. a curved entrance marks and shelters the front door and serves as the pivot point of the floor plan. the building was completed in may 1997. ehasz giacalone architects (now h2m) designed it.
wingate inn, commack
tritec building company was construction manager for the five-story, 111-room wingate inn known as wingate inn commack, located in brentwood, ny, where the sagtikos parkway meets the long island expressway. the 59,000 sq. ft. hotel was completed in october 2003 for commack hospitality, llc, after tritec provided preconstruction services starting in 2001. robert gruber, aia, designed it.
tritec used a prefabricated structural metal stud framing system and precast plank decks, with an eifs exterior. the site required an extensive off-site sewer connection. amenities include an indoor fitness room, spa and limited food service.
dialysis clinic, inc.
tritec building company was construction manager for dialysis clinic, inc.’s 27,500 sq. ft. treatment center in east setauket, ny. the work came in two phases: a 20,000 sq. ft. dialysis treatment facility, occupied in 1997, and a 7,500 sq. ft. addition for patient screening, completed in 2001. gresham, smith and partners was the architect.
the steel and masonry building uses abundant skylights for natural light, with high-end medical finishes, casework and nursing stations. reverse-osmosis waste is handled through a combination of sewer discharge and on-site leaching. tritec returned in 2003 to complete an insurance restoration for the clinic.
“i feel that the owner, dialysis clinics, inc., received outstanding service and a quality product for their investment.”
project coordinator, gresham, smith and partners (architect), on the dci stony brook addition, december 2001
community ambulance of sayville
community ambulance company of sayville (cac) provides 24 hours a day, seven days a week, emergency medical service to sayville, west sayville, bayport, oakdale, and bohemia. cac needed a new facility to replace the small-antiquated 3,800 sq. ft. building they have operated out of since their inception. the new facility on lakeland ave was designed to increase response times to the more than 4,000 calls they receive a year. the larger facility allows cac to store all of their ambulances on-site and be north of the long island rail road’s montauk line, which avoids getting stuck waiting for one of the 43 trains using the rail line each day.
cac choose to hire tritec building company as a construction manager to build this 22,500 square foot project. tritec provided substantial preconstruction and value engineering services and set a guaranteed maximum price (gmp) for the overall project. tritec provided design coordination, with baldassano architecture (now bld architecture) and emtec consulting engineers, construction cost estimating, and coordination of permit approval. preconstruction was completed in 10 months.
the completed 22,500 square foot building is two stories tall and includes a partial basement. the project included significant site work that included clearing, asphalt, pavers, and the installation of a drainage pond for runoff from the roof and site. on the main level, the building features ten apparatus bays, a radio dispatch station, a crew room, sleeping quarters, lavatories, laundry facilities, and medical storage. the second floor features administrative offices, a boardroom, classrooms, a large meeting room, a commercial kitchen, public restrooms, and storage rooms. the ten ambulance bays require a special ventilation system for diesel exhaust removal. the building also includes 1,500 square feet of basement area, an elevator, and a 250 kw emergency generator to ensure uninterrupted service.
the exterior of the building is constructed with brick veneer and precast concrete trim to reflect a classic design consistent with long island architecture. a flat white roof serves to house the building’s mechanical and communications systems that hide behind a beautiful architecturally shingled mansard. installing a white roof is environmentally beneficial by helping to reduce the heat island effect. storefront glass, cementitious trim, fypon soffit brackets, ample parking, led lighting, and indigenous
landscaping make this a handsomely appointed asset for sayville and the surrounding islip towns well into the future.
the construction was completed on time over 12 months and yielded significant cost savings that were returned to the owner.
cd-adapco
tritec building company was the general contractor for cd-adapco’s renovation of its headquarters in melville, long island, new york.
cd-adapco needed its headquarters to reflect the corporate image of this successful high technology company located along long island’s prestigious route 110 business corridor. the four-story flat building facade was built out to give the building stepped dimensional appeal. the dated brick was updated with several thousand square feet of custom manufactured dri-design metal and ombrae panels. the main vestibule was demolished and replaced with a four-sided translucent structure and two angular architectural precast concrete columns. new windows were installed on two levels of the building to match the replaced windows on the third and fourth levels.
after the facade was complete 6,900 sq.ft, interior renovation began. the challenge was to maintain safe egress for cd-adapco’s employees on the main level of the building during construction. the interior upgrade included demolition and re-construction in the selected work zones. tritec provided a new layout on both the first and second floors, including new partition walls, ceilings, oversized doors, custom cabinetry and millwork, finishes, lighting, an elevator retrofit, restroom renovations, and mep upgrades.
an additional 3,420 sq.ft. of interior renovations were constructed for cd-adapco in an adjacent building for new administrative and training facilities, to accommodate cd-adapco’s expanding staff and frequent visitors.
during the three projects, tritec performed additional work at cd-adapco’s headquarters to ensure handicap accessibility and complete code compliance.
brookhaven technology center
in august of 1999, tritec affiliates acquired nine parcels of land totaling approximately 47 acres in a defunct industrial park, then known as the brookhaven r&d plaza. the park is located on the southeast corner of the long island expressway and the william floyd parkway in shirley, long island, new york. all nine parcels are zoned l1- light industrial and located in a compatible growth area and a designated empire zone.
tritec developed and implemented a plan to revitalize and rebrand the park. the plan included renaming the park, the department of energy cleaning the environmental problems caused by brookhaven national laboratory (bnl), and landscaping the common areas. also, the town of brookhaven’s economic development corporation completed the road, electric, water, and gas service.
tritec arranged for a new sewer district to be fully funded, $9,370,000 through the federal stimulus plan and the new york state environmental facilities corporation, creating the town of brookhaven sewer district #2.
tritec built two buildings in the park and has since sold all of its parcels.
briarcliffe college
tritec building company was general contractor for briarcliffe college’s patchogue campus, converting a 66,000 sq. ft. industrial building on the site of the former sweezy’s store in downtown patchogue, ny, into a college facility. tritec demolished the existing interior and built out the new educational space, completing the project in july 2004 for sweezy real estate development, llc. cpg architects designed the conversion.
b’nai israel reform temple
tritec building company was general contractor for an interior renovation of the 4,500 sq. ft. sanctuary and community room at b’nai israel reform temple in oakdale, ny, completed in september 2002. the temple received all-new finishes, including a jerusalem stone ark, new pews, ceilings, lighting and stained glass windows. tritec scheduled the work around the high holy days and finished on time and on budget. ehasz giacalone architects (now h2m) designed the renovation.
bellport primary care center
tritec building company built a new primary care clinic for brookhaven memorial hospital medical center (now long island community hospital) in bellport, ny. the ground-up building is a department of health–approved article 28 facility with 4,000 sq. ft. of medical space over a 4,000 sq. ft. basement. wiedersum associates architects designed it.
tritec’s scope covered the full building: concrete, masonry, cultured stone, cementitious siding, roofing, windows, storefront, carpentry, finishes and mep. interiors include specialty flooring, wall coverings, high-efficiency lighting and millwork. the clinic was completed in about five months, in 2014.
atlantic industrial technologies
atlantic industrial technologies bought land from tritec development group at the brookhaven technology center in shirley, ny, for its corporate headquarters and manufacturing plant. tritec building company then delivered the 15,000 sq. ft. building turnkey, from preconstruction and permitting through construction and final sign-off, completing it in august 2009. ehasz giacalone architects (now h2m) designed it.
the building has a standing-seam roof, masonry and metal-panel walls, and translucent roof panels that bring in daylight and cut lighting costs. an overhead bridge crane runs the full length of one bay for the company’s hydraulic systems work.
arooga’s grille house & sports bar
tritec building company completed the 7,600 sq. ft. build-out of arooga’s grille house & sports bar at 1 west main street in patchogue, ny, in august 2016. the restaurant is part of new village at patchogue, the mixed-use community tritec developed and built in the heart of downtown. the full-service restaurant and sports bar has a 50-seat bar with 47 beers on tap, 101 televisions, six ceiling-mounted subwoofers and a commercial kitchen with high-end ovens and fryers. two six-foot bifold doors open the bar to sidewalk seating on main street. mancini architects designed the space.
building a high-energy restaurant beneath occupied apartments took careful planning. the space sits on a post-tensioned concrete slab, so tritec x-rayed it to locate the tendons before making any penetrations and rerouted plumbing waste lines where they conflicted. a 10-inch level change between the bar and dining area became a ramp. a three-inch change through the kitchen was too heavy for lightweight concrete on the slab, so the team built it up with two-inch wood sleepers, foam, plywood and a self-leveling topping instead.
to keep equipment off the residences, tritec used split hvac systems and ran eight line sets and their electrical service four floors up an existing shaft to the roof. the ceiling has 1½ inches of sound insulation, and the kitchen hood connects to an air-scrubbing system so cooking odors don’t reach the apartments. bar waste piping that runs below the slab through the parking garage is heat-traced and insulated, and the fryer-oil tanks fill and empty through an exterior wall connection, so oil never travels through the dining room.
with residents already living upstairs, work was limited to normal business hours, with no nights or weekends. one week before opening, a car crashed into the space and damaged finished work. tritec’s subcontractors rebuilt the damaged areas immediately, and the restaurant opened just two weeks past its original date.
alternatives for children
alternatives for children (afc), a non-profit educational institution, was relocated by tritec from port jefferson to an enlarged, modern facility in east setauket, long island, new york. tritec worked with afc for the second time, choosing a design-build project delivery method to meet their budget and schedule.
the 36,626 sq.ft. facility contains 26 classrooms, 18 bathrooms, 3,000 sq.ft. physical therapy/gymnasium, computer room, an administration wing with a kitchen, and various other specialty rooms. the property also includes a 4,000 sq.ft. outside playground with special flooring and fence. all spaces were constructed to meet afc’s unique demands that catered to their large population of children with special needs.
allstate insurance company at 100 motor parkway
tritec building company built 45,000 sq. ft. of class a office space for allstate insurance company on the third and fourth floors of 100 motor parkway in hauppauge, ny, a building tritec developed, built and managed. completed in may 2003, the space houses allstate’s new york regional office, claims department and regional training facilities. tritec returned in 2008 for further interior work on both floors.
the fourth floor includes a divisible conference facility for 400 people. the space has a security access system tied into the building’s systems, teleconference facilities, and concourse-level mailroom and storage. tritec delivered the project on a 12-week schedule, on time and within budget despite layout changes during construction.
adelphi hauppauge campus
tritec building company was general contractor for adelphi university’s 14,500 sq. ft. hauppauge education and conference center at 55 kennedy drive in hauppauge, ny, completed in october 2002, with an expansion in july 2003. the center has two multimedia conference rooms and a computer seminar room, and it hosts seminars, conferences and professional programs for local companies, nonprofits and school districts. tritec delivered it on schedule and within budget. steven andujar, aia, was the architect.
the project is part of tritec’s long relationship with the building’s owner, shalam properties, for which tritec has renovated multiple buildings in the hauppauge industrial park, including audiovox’s headquarters.
181 belle mead road
181 belle mead road is a 25,000 sq. ft. medical office building in east setauket, ny, completed in 1990. tritec development group developed it, tritec building company built it, and tritec asset management manages it. ehasz giacalone architects (now h2m) designed the building, which was sold as five medical condominium suites; tritec retained ownership of two.
the largest owner, stony brook medical associates, has used tritec building company for follow-on work, including an x-ray suite and a dermatology suite completed in 2003.
125 kennedy drive
tritec development group bought 125 kennedy drive, a single-tenant industrial building in the hauppauge industrial park, and took it through entitlements to convert it to 100% office use. tritec building company carried out a capital improvement plan from 2006 to 2007: sitework, new canopies over the west and north entrances, screened loading docks, paint, windows, masonry and landscaping, including a north façade renovation completed in march 2007. d3 architecture was the architect.
tritec asset management’s leasing plan filled the 60,000 sq. ft. building with medical and office tenants. tritec building company built many of their spaces, including verizon (2007), austin & williams (2007) and new york community bank (2008). the park, now called the long island innovation park, is home to about 1,300 businesses and 55,000 employees.
50 engineers road
the property is located in the long island innovation park, formerly known as the hauppauge industrial park. the hauppauge industrial park is home to 1,300 businesses and 55,000 employees, making it the largest such complex east of the mississippi river and the second largest in the country. the location provides easy access to the brentwood train station, long island expressway, sagtikos parkway, southern and northern state parkways, and macarthur airport. 50 engineers road is directly adjacent to tritec’s 125 kennedy building and has shared access to each building’s parking lot. the building has more than ample parking to accommodate 18,000 square feet of office and industrial space.
when tritec purchased the property, it was a single-tenant, 30,000 sq. ft. industrial building. tritec development entitled the facility as 60% office 40% industrial/r&d. renovated interiors accommodate tenant’s offices, and tritec added roll-up doors in the warehouse area.
tritec asset management manages the property.
41 research way
tritec built 41 research way at the stony brook technology center in east setauket, ny, as a 33,000 sq. ft. laser manufacturing facility for quantronix corporation, managing it from preconstruction through completion in april 1998. as quantronix grew, tritec added a second phase of equal size, completed in april 2001, with specialized laser calibration labs, a full machine shop and second-floor executive offices. ehasz giacalone architects (now h2m) designed both phases.
in 2013 tritec bought the building from excel technology, quantronix’s parent company, renovated it and leased it to another former client, rockwell automation, whose anorad facility tritec built in 2002. tritec built the original building and its addition, then renovated it again when rockwell moved in.
45 gilpin avenue
tritec rehabilitated 45 gilpin avenue in hauppauge, ny, a dilapidated 171,000 sq. ft. industrial building from 1966. tritec financed, developed, built, owned, managed and eventually sold the project. ehasz giacalone architects (now h2m) designed the renovation.
the anchor tenant, samson technologies, took 120,000 sq. ft. of office and warehouse space, completed in 2006. blue steel exterior panels and bold colors reflect the energy of the music industry samson serves, and the interiors include offices, conference space, and practice and sound rooms. the remaining space was divided among industrial tenants, including clopay and waterboy, whose spaces tritec built in 2007.
“relocating presents numerous challenges to keep business moving forward and require high levels of efficiency and cooperation between all parties. tri tec built our new 120,000 square foot facility with office and warehouse. the job was complex, and we were pleased with the result.”
samson technologies, august 2006
49 wireless boulevard
in 2004, tritec development group acquired 49 wireless boulevard, an 86,500 sq. ft. industrial building on 7.4 acres in hauppauge, ny, and repositioned it as class b+ office space. tritec building company renovated the building, keeping its quality brick façade and adding new windows, champagne moldings, canopies, landscaping and accent lighting, including a south façade renovation completed in 2007. tritec asset management manages the property. tpg architecture was the architect.
tritec building company has fit out a series of tenants since, including kidz therapy (2006), esurance (2007) and duralee (2015), whose new offices tritec delivered “at break-neck speed.” amenities include a full-service café, conference center, mailrooms, lawns, an outdoor eating area, bike racks and showers.
“thank you for your hard work and effort to build our new offices here in hauppauge. you did a great job and got us moved in at break-neck speed.”
duralee, march 2016
31 west main street
31 west main street is a mixed-use office and retail building in the middle of tritec’s new village project. new village is the heart of patchogue’s successful downtown revitalization. 31 west main street, originally built in 1897, was restored and renovated after tritec purchased the property.
the original structure once stood with impressive architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings, many of these features have returned in the revitalization. hundred-year-old brick from the original building is on display in the interior of some of the tenant spaces.
redevelopment of the facade reintroduced the original design of the building cornice and third floor after it was destroyed by fire in the 1960s. construction included replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms, and hallways. the building has become a jewel of main st and is at a prime location in the heart of the new village project.
tritec completed the restoration in 2009. 31 west main street is part of new village at patchogue.
24 research way
developed and constructed by tritec, 24 research way is a class a medical office building located on 3.4 acres in the stony brook technology center in east setauket, long island. designed with both functionality and patient convenience in mind, this 20,400 square foot single-story building offers direct suite entrances that open onto the parking lot, allowing for easy access and enhanced privacy for medical practices.
the building’s exterior features a distinctive combination of two-tone brick, tinted glass, and striking aluminum trim overhangs, creating a professional and modern appearance. inside, suites are laid out to support a variety of medical specialties, with water-view suites and beautiful landscaping contributing to a calm and welcoming environment for patients and staff.
currently, 17,400 square feet of space is available, offering flexible configurations for healthcare providers seeking a high-quality, conveniently located facility.
the layout focuses on multi-tenant medical use, ample parking, and efficient circulation. the single-story configuration and direct suite access make 24 research way especially attractive for practices that prioritize patient convenience and accessibility.
professionally managed by tritec asset management, tenants benefit from responsive service and a well-maintained facility in one of long island’s most established medical and research hubs.
maria valanzano and steven d’orazio of colliers represent tritec at this property and are available to discuss leasing opportunities tailored to your practice or business.
3 technology drive
3 technology drive is a 20,338 sq. ft. building, completed in 1990, in the stony brook technology center in east setauket, ny, designed for both medical offices and research and development. tritec development group developed it, tritec building company built it under a design-build contract, and tritec asset management manages it. ehasz giacalone architects (now h2m) designed the aluminum panel and thermopane glass exterior.
the building sits less than four miles from three major hospitals (mather, stony brook university hospital and st. charles) and has access to sewer, which is rare for commercial sites near stony brook university. tritec building company has fit out space inside for stony brook university, including suny offices completed in 2002 and 2003.
in november 2025, northwell health physician partners expanded at 3 technology drive, adding 6,717 rentable sq. ft. to its existing 6,240 for a new northwell primary care facility. northwell now occupies 12,957 rentable sq. ft. in the building. “with space available in the park and a location less than four miles from three major hospitals, the stony brook technology center offers unmatched convenience and opportunity for healthcare institutions,” said karen shelhorse, vice president of tritec asset management.