TRITEC Building Company built the 133-room Holiday Inn Express in Hauppauge, NY, completed in March 2002 for Hauppauge Hotels, LLC. The seven-story, 75,000 sq. ft. hotel used a prefabricated structural metal stud framing system with precast plank decks, letting TRITEC erect one floor every eight days. The prefabricated exterior panels for the whole building went up in 30 days. BHA Architects designed the hotel.
Amenities include a fitness center, heated pool and large meeting rooms. An on-site Chromaglass system treats sewage discharge.
TRITEC Building Company built the 133-room, seven-story hotel, completed in March 2002.
Prefabricated metal stud framing and precast plank let TRITEC erect a floor every eight days and close the exterior in 30 days.