








TRITEC Building Company built the 16,000 sq. ft. interior of the Port Jefferson Surgery Center, an Article 28 ambulatory surgery facility at 1500 Route 112 in Port Jefferson Station, NY. The center is a partnership of 19 community surgeons, Mather Hospital and Pinnacle III. Dominick A. Termini, AIA, of Pallante Design was the architect.
The build-out includes six operating suites, pre-op and post-op recovery, nursing stations, reception and administrative space. TRITEC installed the center’s complex systems: a chiller, negative and positive air pressure, humidification for procedure rooms, medical gas, vacuum and air, a steam generator for sterilization, and a generator that can power the whole building. Construction ran from April 2017 to January 10, 2018.
TRITEC Building Company built the center’s 16,000 sq. ft. interior, completed January 10, 2018.
It is a facility licensed by New York State under Article 28 of the Public Health Law, which sets strict building and systems standards. TRITEC’s build-out met those codes for medical gas, air pressure and backup power.
Six operating suites, pre-op and post-op recovery, nursing stations, reception and administrative space.
It is a partnership of 19 community surgeons, Mather Hospital and Pinnacle III.
Sign up for our mailing list to stay up-to-date with the latest from TRITEC