TRITEC Building Company constructed interior spaces at the Port Jefferson Surgery Center at 1500 NY-112 Building 3, Route 112 in Port Jefferson Station. The project, designed by Dominick A. Termini, AIA of Pallante Design, is a partnership between 19 community surgeons, Mather Hospital, and Pinnacle III, a company that has developed ambulatory surgery centers nationwide.

The 16,000 sq. ft. Article 28 medical office interior build-out features six state-of-the-art operating suites, a pre-op and post-op recovery area, nursing stations, reception, and administrative space. Construction of the interiors began in April 2017 and was completed on January 10, 2018. The build-out included complex mechanical systems that feature a chiller unit, negative and positive air as required, and a humidification system for the procedure rooms. Medical gas, vacuum, and air were installed to service the pre-op, procedure rooms, and post-op, meeting all codes and requirements. TRITEC installed a generator that can supply electricity to the entire building so power outages will not affect any procedures or patient outcomes. This facility also has a steam generator for sterilizing all of its equipment. The construction materials selected prevent bacterial growth and were selected for easy cleaning. The modern design is clean and welcoming to patients.

Size and Info

  • Total SF: 16,000 sq. ft.
  • Architect: Pallante Design

Location

Location

1500 NY-112 Building 3, Port Jefferson Station, NY 11776