TRITEC Building Company · Design-Build
TRITEC Building Company is a design-builder for owners across Long Island, New York and the Washington, D.C. region. We hold the design and construction contracts together, so the owner has a single point of contact and one team accountable for quality, cost and schedule from concept to move-in.
Proven for manufacturers, hospitals, schools and the U.S. Postal Service.

What design-build is
TRITEC Building Company can assembles the team: licensed architects and engineers working under our contract, alongside our in-house preconstruction and construction management staff. Every design, construction and coordination decision runs through a single point of contact, from the first concept to completion.
Because designers and builders work as one team from the first sketch, cost, schedule and constructability are tested while the design is still flexible, and construction can begin before the drawings are finished. Our preconstruction team is led by Martin DePasquale, a registered architect, so design decisions are reviewed by someone who has practiced on both sides of the table.
Why owners choose design-build
01
One firm answers for design and construction, so the owner can focus on scope and decisions instead of coordinating between designer and builder.
02
The design-build team, not the owner, is responsible for complete drawings and specifications. For the U.S. Postal Service, TRITEC met six volumes of USPS standards across three distribution centers, within budget.
03
Value engineering works best when designers and builders sit at the same table. When escalation pushed SMSC’s budget up 25 percent, TRITEC recovered more than half of the overrun without changing scope or design intent.
04
Design and construction overlap, so procurement and site work start before documents are complete. Anorad’s 130,000 SF facility was fast-tracked from a 10-month schedule to seven and a half months.
05
Design and estimating run together, so cost is known early. Island Nursing and Rehabilitation Center was estimated at $18.3 million at the outset and finished at exactly $18.3 million.
Design-build experience
Manufacturing plants, headquarters, health care, education and federal facilities, each designed and built by one TRITEC-led team.
| Project | Location | Size | Sector |
|---|---|---|---|
| 100 & 102 Motor Parkway | Hauppauge, NY | 408,000 SF | Class A office |
| SMSC (Standard Microsystems) | Hauppauge, NY | 200,000 SF | Headquarters and test facility |
| Anorad, a Rockwell Automation company | Shirley, NY | 130,000 SF | Manufacturing and R&D |
| Island Nursing and Rehabilitation Center | Holtsville, NY | 81,000 SF | Skilled nursing |
| U.S. Postal Service, Western Nassau | Garden City, NY | 65,000 SF | Mail processing |
| U.S. Postal Service, Kilmer | Edison, NJ | 65,000 SF | Mail processing |
| Quantronix | East Setauket, NY | 65,000 SF | Manufacturing |
| U.S. Postal Service | West Palm Beach, FL | 55,000 SF | Mail processing |
| Life Quality BMW | Brooklyn, NY | 50,000 SF | Auto dealership |
| 4 Technology Drive | East Setauket, NY | 40,125 SF | Medical office |
| Alternatives for Children | East Setauket, NY | 36,000 SF | Education |
| 6 Technology Drive | East Setauket, NY | 27,000 SF | Medical office |
| Richards of Greenwich | Greenwich, CT | 27,000 SF | Retail |
| Western Suffolk BOCES at Republic Airport | Farmingdale, NY | 24,000 SF | Education |
| 3 Technology Drive | East Setauket, NY | 20,338 SF | Medical and R&D |
| Dove Electronics | East Setauket, NY | 15,000 SF | Headquarters and distribution |
Need a different route? The same team also delivers construction management and general contracting.
Design-build vs. CM vs. GC
All three build the project. The difference is when the builder joins, and who holds the design team’s contract.
With design-build, the builder and designers start together. Cost is known from the first estimates, the price is set early in design, and construction can begin while the drawings are finished: one contract, one point of contact, one team accountable for the result.
| Design-build | Construction management | General contracting (bid) | |
|---|---|---|---|
| When the builder joins | At concept, before design | During design | After drawings are complete |
| How the builder is chosen | Qualifications and a combined design-and-build proposal | Qualifications, approach and fee | Lowest qualified lump-sum bid |
| Builder’s role | Holds both the design and construction contracts | The owner’s advocate, paid a set fee | Delivers the drawings for the bid price |
| When cost is known | Early, from the first estimates, then refined as the design develops | Early, refined at each design milestone, then fixed as a GMP | When bids come in |
| Builder’s design input | Full, since one team owns the design | Constructability and value engineering at 10, 30, 70 and 100 percent | Little or none before the bid |
| Books | Usually open | Open | Closed |
| Best fit | Speed, firm budgets and a single point of accountability | Complex projects, firm budgets, owners who want a voice in design | Complete documents, simple scope, price-driven decisions |
Design-build puts the builder and the designers on one team from day one, so cost, schedule and constructability shape the design instead of reacting to it. It is the fastest route from concept to occupancy, with one contract and one point of accountability.
Our design-build process
Four phases, each with defined deliverables, with design and construction on one integrated schedule.
01
We define scope, schedule and goals with the owner and assemble the design team. A conceptual budget ranges each line item from low to target to high, so the owner sees the real options before design begins.
02
Design reviews at 10, 30, 70 and 100 percent test constructability and coordination between structural, mechanical, electrical and architectural work. The budget is re-estimated at every stage, with value engineering and life-cycle cost review throughout.
03
Design is released in packages so site work, foundations and long-lead items start while interiors and systems are finished. Every trade is competitively bid, and three inspections on each phase of work (before it starts, at first installation and follow-up) hold quality.
04
As-builts, O&M manuals, warranties, systems training, a final cost report and the Certificate of Occupancy, delivered by the same team that designed and built the project.
Optional early-stage support: Before preconstruction begins, TRITEC can also help owners with site feasibility, entitlements and approvals, and defining the project program.
Methodology and project controls
In design-build, design decisions and construction costs are managed together. Our project controls system tracks budget, schedule, documents and reports on every job, and the owner sees the same data our team does.
Costs are shaped most during design, not construction. A control budget built on historical data and subcontractor pricing is updated at every design stage, and any deviation goes to the owner with a recommendation before it becomes a change.
Design milestones and construction activities live in one schedule. Each design package is timed so the next phase of construction can start without waiting, and progress is reviewed weekly with the owner and design team.
Our standard is to meet or exceed the owner’s requirements, the first time. Submittals, RFIs and changes are logged with clear accountability, and deficiencies are tracked until they are corrected.
7.5
Months to build Anorad’s 130,000 SF facility, fast-tracked from 10
$18.3M
Island Nursing’s estimate and final cost, an exact match
3
U.S. Postal Service centers in three states
2007
CMAA Project of the Year, SMSC
Featured projects

A 130,000 SF headquarters, engineering and manufacturing facility with a 40,000 SF cleanroom, fast-tracked from 10 months to 7.5 and delivered under budget.

A 200,000 SF headquarters and test facility expanded and renovated while the plant ran 24/7. CMAA New York Chapter Project of the Year, 2007.

Design-build expansions of three processing and distribution centers in New York, New Jersey and Florida, with no interruption to mail processing.

A 120-bed, 81,000 SF facility for the Mather-St. Charles Hospital Health Alliance, finished at exactly its $18.3 million estimate.

A 24,000 SF aviation education facility combining an aircraft hangar, classrooms and labs, fast-tracked to meet the school’s schedule and budget.

A 36,626 SF school with 26 classrooms and a therapy gym, delivered as design-build in TRITEC’s second project for this nonprofit.
Design/Build is a complex project to undertake, especially in a tight scheduled timeframe of six months. TRITEC’s level of professionalism and team effort was a major contribution to the success of this project.
Deborah M. Weiss, Manager, In-Plant Support, Western Nassau P&DC, U.S. Postal Service
TRITEC rose to the occasion and Anorad was able to occupy the facility just 7 short months after breaking ground. In most instances I found TRITEC’s standards for workmanship to exceed my own.
David J. Cordts, Vice President, Anorad
TRITEC is an organization that has assembled a group of professionals to deal with every aspect of a building project. They have a positive ‘can do’ attitude at all times.
Francis G. Postel, Divisional Vice President, Facilities, SMSC
Design-build is a project delivery method in which the owner hires one firm to deliver both design and construction under a single contract. TRITEC Building Company leads the team, with licensed architects and engineers working under our contract, so the owner has one point of contact and one team accountable for quality, cost and schedule.
In construction management, the owner hires the architect and the construction manager separately, and the CM joins during design. In design-build, TRITEC holds both the design and construction contracts and joins at concept, so the design is developed and priced by one team from the start.
Licensed architects and engineers under contract to TRITEC Building Company. Our design-build projects have been designed by firms including architects from H2M and BLD Architecture. On TRITEC’s side, preconstruction is led by Martin DePasquale, a registered architect.
Usually. Because design and construction overlap, procurement and site work can start before the drawings are complete. TRITEC fast-tracked Anorad’s 130,000 SF facility from a 10-month schedule to seven and a half months, and finished the U.S. Postal Service expansion in Garden City in six months.
Early. Design and estimating run together, starting with a conceptual budget and refined at every design stage. At Island Nursing and Rehabilitation Center, the initial $18.3 million estimate matched the final cost exactly.
In practice, yes. On TRITEC developments, TRITEC Development Group hires the architect and TRITEC Building Company together, and TBC leads the combined team from concept to completion. It is the same integrated approach we bring to outside owners.
No. TRITEC Building Company works for outside owners, including manufacturers, health systems, schools and the U.S. Postal Service, as a design-builder, construction manager or general contractor.
Call 631.751.0300, email info@tritecre.com or use the form below. We’ll set up a conversation about your project, budget and timeline.
Design-build pays off most when we start together. Tell us what you’re planning, and we’ll show you how one team can deliver it.
631.751.0300 · info@tritecre.com