Design-build: one team, one contract, full accountability

TRITEC Building Company is a design-builder for owners across Long Island, New York and the Washington, D.C. region. We hold the design and construction contracts together, so the owner has a single point of contact and one team accountable for quality, cost and schedule from concept to move-in.

Proven for manufacturers, hospitals, schools and the U.S. Postal Service.

Cleanroom at Anorad, a Rockwell Automation company, delivered by TRITEC Building Company as fast-track design-build

What design-build is

Designers and builder on the same side of the table


TRITEC Building Company can assembles the team: licensed architects and engineers working under our contract, alongside our in-house preconstruction and construction management staff. Every design, construction and coordination decision runs through a single point of contact, from the first concept to completion.

Because designers and builders work as one team from the first sketch, cost, schedule and constructability are tested while the design is still flexible, and construction can begin before the drawings are finished. Our preconstruction team is led by Martin DePasquale, a registered architect, so design decisions are reviewed by someone who has practiced on both sides of the table.

Why owners choose design-build

One team accountable for everything

01

Singular responsibility

One firm answers for design and construction, so the owner can focus on scope and decisions instead of coordinating between designer and builder.

02

Quality in the documents

The design-build team, not the owner, is responsible for complete drawings and specifications. For the U.S. Postal Service, TRITEC met six volumes of USPS standards across three distribution centers, within budget.

03

Cost savings

Value engineering works best when designers and builders sit at the same table. When escalation pushed SMSC’s budget up 25 percent, TRITEC recovered more than half of the overrun without changing scope or design intent.

04

Time savings

Design and construction overlap, so procurement and site work start before documents are complete. Anorad’s 130,000 SF facility was fast-tracked from a 10-month schedule to seven and a half months.

05

Early, firm costs

Design and estimating run together, so cost is known early. Island Nursing and Rehabilitation Center was estimated at $18.3 million at the outset and finished at exactly $18.3 million.

Design-build experience

Projects delivered under one contract

Manufacturing plants, headquarters, health care, education and federal facilities, each designed and built by one TRITEC-led team.

ProjectLocationSizeSector
100 & 102 Motor ParkwayHauppauge, NY408,000 SFClass A office
SMSC (Standard Microsystems)Hauppauge, NY200,000 SFHeadquarters and test facility
Anorad, a Rockwell Automation companyShirley, NY130,000 SFManufacturing and R&D
Island Nursing and Rehabilitation CenterHoltsville, NY81,000 SFSkilled nursing
U.S. Postal Service, Western NassauGarden City, NY65,000 SFMail processing
U.S. Postal Service, KilmerEdison, NJ65,000 SFMail processing
QuantronixEast Setauket, NY65,000 SFManufacturing
U.S. Postal ServiceWest Palm Beach, FL55,000 SFMail processing
Life Quality BMWBrooklyn, NY50,000 SFAuto dealership
4 Technology DriveEast Setauket, NY40,125 SFMedical office
Alternatives for ChildrenEast Setauket, NY36,000 SFEducation
6 Technology DriveEast Setauket, NY27,000 SFMedical office
Richards of GreenwichGreenwich, CT27,000 SFRetail
Western Suffolk BOCES at Republic AirportFarmingdale, NY24,000 SFEducation
3 Technology DriveEast Setauket, NY20,338 SFMedical and R&D
Dove ElectronicsEast Setauket, NY15,000 SFHeadquarters and distribution

Need a different route? The same team also delivers construction management and general contracting.

Design-build vs. CM vs. GC

Design-builder, construction manager or general contractor?

All three build the project. The difference is when the builder joins, and who holds the design team’s contract.

With design-build, the builder and designers start together. Cost is known from the first estimates, the price is set early in design, and construction can begin while the drawings are finished: one contract, one point of contact, one team accountable for the result.

Design-buildConstruction managementGeneral contracting (bid)
When the builder joinsAt concept, before designDuring designAfter drawings are complete
How the builder is chosenQualifications and a combined design-and-build proposalQualifications, approach and feeLowest qualified lump-sum bid
Builder’s roleHolds both the design and construction contractsThe owner’s advocate, paid a set feeDelivers the drawings for the bid price
When cost is knownEarly, from the first estimates, then refined as the design developsEarly, refined at each design milestone, then fixed as a GMPWhen bids come in
Builder’s design inputFull, since one team owns the designConstructability and value engineering at 10, 30, 70 and 100 percentLittle or none before the bid
BooksUsually openOpenClosed
Best fitSpeed, firm budgets and a single point of accountabilityComplex projects, firm budgets, owners who want a voice in designComplete documents, simple scope, price-driven decisions

Design-build puts the builder and the designers on one team from day one, so cost, schedule and constructability shape the design instead of reacting to it. It is the fastest route from concept to occupancy, with one contract and one point of accountability.

Our design-build process

From concept to keys, under one contract

Four phases, each with defined deliverables, with design and construction on one integrated schedule.

01

Program and concept

We define scope, schedule and goals with the owner and assemble the design team. A conceptual budget ranges each line item from low to target to high, so the owner sees the real options before design begins.

02

Design and pricing

Design reviews at 10, 30, 70 and 100 percent test constructability and coordination between structural, mechanical, electrical and architectural work. The budget is re-estimated at every stage, with value engineering and life-cycle cost review throughout.

03

Fast-track construction

Design is released in packages so site work, foundations and long-lead items start while interiors and systems are finished. Every trade is competitively bid, and three inspections on each phase of work (before it starts, at first installation and follow-up) hold quality.

04

Closeout

As-builts, O&M manuals, warranties, systems training, a final cost report and the Certificate of Occupancy, delivered by the same team that designed and built the project.

Optional early-stage support: Before preconstruction begins, TRITEC can also help owners with site feasibility, entitlements and approvals, and defining the project program.

Methodology and project controls

One schedule. One budget. One team.


In design-build, design decisions and construction costs are managed together. Our project controls system tracks budget, schedule, documents and reports on every job, and the owner sees the same data our team does.

Cost control during design

Costs are shaped most during design, not construction. A control budget built on historical data and subcontractor pricing is updated at every design stage, and any deviation goes to the owner with a recommendation before it becomes a change.

One integrated schedule

Design milestones and construction activities live in one schedule. Each design package is timed so the next phase of construction can start without waiting, and progress is reviewed weekly with the owner and design team.

Quality and document control

Our standard is to meet or exceed the owner’s requirements, the first time. Submittals, RFIs and changes are logged with clear accountability, and deficiencies are tracked until they are corrected.

What the owner receives

  • Weekly progress meetings and minutes
  • Monthly status report with updated schedule and cost narrative
  • Procore for real-time schedule, submittals and documents
  • Yardi for invoices, requisitions and budget integrity
  • In-house estimating, scheduling, safety, risk management and quality control
  • Close-out manual and final cost report

7.5

Months to build Anorad’s 130,000 SF facility, fast-tracked from 10

$18.3M

Island Nursing’s estimate and final cost, an exact match

3

U.S. Postal Service centers in three states

2007

CMAA Project of the Year, SMSC

Featured projects

Delivered as design-build

Anorad, a Rockwell Automation company, delivered as design-build by TRITEC Building Company

Anorad, a Rockwell Automation company

A 130,000 SF headquarters, engineering and manufacturing facility with a 40,000 SF cleanroom, fast-tracked from 10 months to 7.5 and delivered under budget.

Manufacturing · Fast-track design-build · Shirley, NY

SMSC (Standard Microsystems), delivered as design-build by TRITEC Building Company

SMSC (Standard Microsystems)

A 200,000 SF headquarters and test facility expanded and renovated while the plant ran 24/7. CMAA New York Chapter Project of the Year, 2007.

Headquarters · Design-build + CM · Hauppauge, NY

U.S. Postal Service, delivered as design-build by TRITEC Building Company

U.S. Postal Service

Design-build expansions of three processing and distribution centers in New York, New Jersey and Florida, with no interruption to mail processing.

Federal · Design-build · NY, NJ and FL

Island Nursing and Rehabilitation Center, delivered as design-build by TRITEC Building Company

Island Nursing and Rehabilitation Center

A 120-bed, 81,000 SF facility for the Mather-St. Charles Hospital Health Alliance, finished at exactly its $18.3 million estimate.

Skilled nursing · Design-build · Holtsville, NY

Western Suffolk BOCES at Republic Airport, delivered as design-build by TRITEC Building Company

Western Suffolk BOCES at Republic Airport

A 24,000 SF aviation education facility combining an aircraft hangar, classrooms and labs, fast-tracked to meet the school’s schedule and budget.

Education · Fast-track design-build · Farmingdale, NY

Alternatives for Children, delivered as design-build by TRITEC Building Company

Alternatives for Children

A 36,626 SF school with 26 classrooms and a therapy gym, delivered as design-build in TRITEC’s second project for this nonprofit.

Education · Design-build · East Setauket, NY

What clients say

Design/Build is a complex project to undertake, especially in a tight scheduled timeframe of six months. TRITEC’s level of professionalism and team effort was a major contribution to the success of this project.

Deborah M. Weiss, Manager, In-Plant Support, Western Nassau P&DC, U.S. Postal Service

U.S. Postal Service · Design-build →

TRITEC rose to the occasion and Anorad was able to occupy the facility just 7 short months after breaking ground. In most instances I found TRITEC’s standards for workmanship to exceed my own.

David J. Cordts, Vice President, Anorad

Anorad · Fast-track design-build →

TRITEC is an organization that has assembled a group of professionals to deal with every aspect of a building project. They have a positive ‘can do’ attitude at all times.

Francis G. Postel, Divisional Vice President, Facilities, SMSC

SMSC · Design-build + CM →

Frequently asked questions

What is design-build?

Design-build is a project delivery method in which the owner hires one firm to deliver both design and construction under a single contract. TRITEC Building Company leads the team, with licensed architects and engineers working under our contract, so the owner has one point of contact and one team accountable for quality, cost and schedule.

How is design-build different from construction management?

In construction management, the owner hires the architect and the construction manager separately, and the CM joins during design. In design-build, TRITEC holds both the design and construction contracts and joins at concept, so the design is developed and priced by one team from the start.

Who designs a TRITEC design-build project?

Licensed architects and engineers under contract to TRITEC Building Company. Our design-build projects have been designed by firms including architects from H2M and BLD Architecture. On TRITEC’s side, preconstruction is led by Martin DePasquale, a registered architect.

Is design-build faster?

Usually. Because design and construction overlap, procurement and site work can start before the drawings are complete. TRITEC fast-tracked Anorad’s 130,000 SF facility from a 10-month schedule to seven and a half months, and finished the U.S. Postal Service expansion in Garden City in six months.

When will I know what my project costs?

Early. Design and estimating run together, starting with a conceptual budget and refined at every design stage. At Island Nursing and Rehabilitation Center, the initial $18.3 million estimate matched the final cost exactly.

Does TRITEC use design-build on its own developments?

In practice, yes. On TRITEC developments, TRITEC Development Group hires the architect and TRITEC Building Company together, and TBC leads the combined team from concept to completion. It is the same integrated approach we bring to outside owners.

Does TRITEC Building Company only build TRITEC developments?

No. TRITEC Building Company works for outside owners, including manufacturers, health systems, schools and the U.S. Postal Service, as a design-builder, construction manager or general contractor.

How do I get started?

Call 631.751.0300, email info@tritecre.com or use the form below. We’ll set up a conversation about your project, budget and timeline.

Let’s talk about your project while it’s still a concept

Design-build pays off most when we start together. Tell us what you’re planning, and we’ll show you how one team can deliver it.

631.751.0300 · info@tritecre.com

Have Fun / Win / Be Nice

  • This field is for validation purposes and should be left unchanged.