I would like to thank you and the entire Tritec team for the outstanding job done on the Anorad Brookhaven Facility. It was a real pleasure dealing with Tritec, from site selection, through the design phase, construction, to move in. It was imperative that the facility be designed and built in time for Anorad to occupy before the end of it’s fiscal year, September 31, 2002 without sacrificing the quality of the project in any way. This was a tall order given that ground breaking took place in mid-February of 2002. Tritec rose to the occasion and Anorad was able to occupy the facility just 7 short months after breaking ground and moved in on September 20, 2002.
Tritec’s expertise in managing projects of this scope and magnitude was clear from the start. Even with the tight time frame and the resulting pressures on all to perform, Tritec’s position was always to do the right job so as to end up with a product with which Anorad would be pleased. In most instances I found Tritec’s standards for workmanship to exceed my own and this made my role as project manager for Anorad a real pleasure.
From the start Anorad demanded a facility that was state-of-the-art in the Precision Motion Industry, that would convey that message to our customers and would be a competitive advantage in our market place. The resulting 130,000 square foot engineering, development and manufacturing facility is a home run in all these regards and more. I would be pleased to serve as a reference for Tritec Building Company and would be happy to respond to any inquiries on the Anorad Brookhaven Facility Project.