TRITEC Building Company · Preconstruction
Anyone can put together an estimate. What our team of architects and engineers, who have been in the field and actually run jobs, can tell you is what your project is going to cost, how long it’s going to take, and what could go wrong before you spend a single dollar on construction.
Led by a registered architect and a chief estimator with two decades at TRITEC. Building since 1986.

What preconstruction is
During preconstruction, we work with the owner and the architect to develop a defined scope of work. That scope sets the cost parameters and the scheduling criteria, so everyone understands the project’s financial picture and timeline before construction documents are finished.
Our team of design and construction professionals keeps the program, budget and schedule on track while respecting the architect’s design and vision. We hold regular meetings along the way, so the owner stays involved and informed at every decision point.
Preconstruction is the first phase of our construction management process, and we also provide it on design-build projects.
What makes our preconstruction different
01
Our preconstruction professionals have designed projects from the ground up and resolved conflicts in the field. They read drawings for design intent and for what will actually happen on site, and every constructability comment comes with a solution.
02
TRITEC develops, owns and manages its own buildings, so we know what a lender needs to see. We treat the initial budget as the number we answer to, the same standard we hold on our own projects, and every third-party owner we build for gets that discipline.
03
From the first estimate on, you see project costs as they develop, with full visibility at every stage. No black box and no surprise reconciliation at the end.
04
A dedicated risk management division reviews insurance, liability transfer and subcontractor capacity, so exposure is addressed before the contract is signed, not after a problem.
05
Decades of trade buyouts across Long Island and Northern Virginia give us current cost data and subcontractor relationships no database can replicate.
Working with the design team
Our goal is to build the best version of the design, not to cut corners. When a cost or constructability question comes up, we bring options and pricing to the owner and architect together, so decisions are made with the full picture.
Our preconstruction process
Each phase has defined deliverables, reviewed with the full project team before the next one begins.
01
We review the owner’s program, existing conditions and phasing needs, then prepare a conceptual budget and schedule.
02
A preconstruction services manual sets milestone deliverables, drawing review protocols and the reporting calendar.
03
Constructability reviews and value engineering at 10, 30, 70 and 100 percent design, each priced against the control budget.
04
Phasing, site logistics, long-lead items and support for the architect on permits and jurisdictional approvals.
05
Scope sheets for every trade, at least three qualified bidders each, leveled bids and owner participation in every award.
Deliverables and tools
Every estimate, review and schedule is indexed and available to the owner, electronically or in print.
Procore for drawings, RFIs and bid distribution; Oracle Primavera P6 for scheduling, with an independent third-party scheduler who checks our assumptions; and decades of historical cost and subcontractor data from our own projects.
Occupied and complex facilities
Some of our most important preconstruction work happens before a single wall comes down: phasing, separation and access plans that keep the building running.
Seven years of phased work, including operating rooms built while the adjacent ORs stayed in service.
A student center addition and science wing renovation, completed on an active campus.
A 120,000 SF addition and an 80,000 SF renovation in Hauppauge with continuous operations throughout.
Renovation across three suites, one occupied, including installation of a new PET/CT scanner.
Our preconstruction team

Executive Vice President of Preconstruction
A New York State licensed architect since 1991 and former architecture firm principal, he aligns design intent, constructability and budget.

Chief Estimator
With a degree in architecture and at TRITEC since 2006, she leads estimating from early conceptual budgets through final bid development.

Assistant Project Manager
With a degree in mechanical engineering, Kyle spent years in the field as a project manager building The Wel and Shoregate. He brings that field experience to solving constructability issues before they reach the site.

Preconstruction Estimating Engineer
Holds a degree in civil engineering and a master’s in construction management, and supports scope, pricing and estimate coordination.
Saint Anthony’s High School was so fortunate to have TRITEC Building Company accept this project because the level of professionalism and attention to detail was exceptional. How many projects in the New York metropolitan area can be given a reasonable assurance that the cost would be contained and most importantly that it be completed before the projected date!
Brother Gary Cregan, Principal, Saint Anthony’s High School
We had a tight budget and only 11 months to complete a 124-room hotel in a challenging entitlement and oversight environment. We are thrilled that we opened on time and under the GMP.
Mark Stebbins, Managing Member, S&S Hotels
Technology and judgment
AI is speeding up takeoffs, drawing reviews and cost analysis. The results depend on what each company brings to the tools.
We bring decades of historical cost and subcontractor data from past projects, so the tools work from real numbers, not industry averages. We bring the construction knowledge to direct technology and to check what it produces. Our organization has always been technology forward, and we continue to invest in its use and training.
Just like a construction estimate, AI is only as good as the team behind it.
Value, not just price
Projects with formal preconstruction see up to
30%
Fewer cost overruns
25%
Faster delivery
Source: FMI
Those figures come from FMI, an industry-specialized consulting and investment banking firm serving engineering, construction and the built environment for nearly 70 years. The team you bring in decides how much of that you actually get.
A low number without strong cost controls is hidden risk. A late opening costs more than carry: lost revenue, idle staff and a team left waiting. And a builder with a hard-bid mindset will fight you on every change order.
We’d rather be the partner who pulls the rope with your team from the first meeting to the last day. Choose on the team, the system, the risk, the schedule and the partnership. Not price alone.
Preconstruction is the planning phase before construction starts. The builder works with the owner and architect to define scope, develop and update the budget, review the design for constructability, build the schedule and prepare the trades for bidding.
As early as the design allows, ideally during schematic design. The earlier we’re involved, the more design decisions can be weighed against cost and schedule before the documents are complete.
At each design milestone, typically 10, 30, 70 and 100 percent. Each estimate is reconciled against the control budget, and differences go to the owner and architect with options.
No. Value engineering looks for the best value for the owner’s goals, such as a different system, material or sequence that keeps the design intent. Options are priced and reviewed with the architect before any decision is made.
No. Preconstruction is built into our construction management process, and we also provide it on design-build projects.
A defined scope, a reconciled budget, a baseline schedule, a phasing and logistics plan, leveled trade bids, and a final estimate or guaranteed maximum price.
No. We would never start a TRITEC development without preconstruction, and TRITEC Building Company brings that same process to outside owners as a fully independent third party on construction management and design-build projects.
It speeds up takeoffs, document review and historical cost analysis, but we never rely on AI alone. Professional review and accountability for every recommendation stay with our team.
A low estimate without strong cost controls and risk management often becomes a higher final cost. Compare the team, the cost controls, the risk and the schedule, not just the number.
Every design milestone is a chance to confirm the budget and schedule. Tell us what you’re planning and where the design stands.