• Medical

Port Jefferson Surgery Center

  • Medical
PJAS_OR
PJAS_lobby
PJAS_nurses station v2
PJAS_sanitize2
PJAS_recovery
PJAS_sanitize
PJAS_nurses station
PJAS_Mechanicals
PJAS_lobbyv2
1 / 9

Overview

TRITEC Building Company constructed interior spaces at the Port Jefferson Surgery Center at 1500 New York-112 Building 3, Route 112 in Port Jefferson Station. The project, designed by Dominick A. Termini, AIA of Pallante Design, is a partnership between 19 community surgeons, Mather Hospital and Pinnacle III, a company that has developed ambulatory surgery centers nationwide.

The 16,000 sq. ft. Article 28 medical office interior build-out features six state-of-the-art operating suites, a pre-op and post-op recovery area, nursing stations, reception and administrative space. Construction of the interiors began in April 2017 and was completed on January 10, 2018. Complex mechanical systems that feature a chiller unit, negative and positive air as required, and a humidification system for the procedure rooms were part of the build-out. Medical gas, vacuum, and air were installed to service the pre-op, procedure rooms, and post-op, meeting all codes and requirements. TRITEC installed a generator that can supply
electricity to the entire building so power outages will not affect any procedures. This facility also has a steam generator for sterilizing all of its equipment. The construction materials selected prevent bacterial growth and were selected for easy cleaning. The modern design is clean and welcoming to patients.

Size and Info

  • Total SF: 16,000 sq. ft.
  • Architect: Pallante Design

Location

Location

1500 NY-112 Building 3, Port Jefferson Station, NY 11776