John T. Mather Memorial Hospital

History

TRITEC first began working with Mather Hospital on several projects for the Mather-St.Charles Hospital Health Alliance. The first project TRITEC undertook with the Alliance was the Jefferson's Ferry a 420,000 sf. continuing care retirement community. This high end residential complex provides independent residential living, an activity center, and healthcare. There are three types of living quarters contained within Jefferson's Ferry: senior housing, assisted living, and skilled nursing care. TRITEC completed construction in May of 2001.

Project Size:
Location:75 North Country Road Port Jefferson, New York 11777
Architect:Cannon Design

During the construction of Jefferson’s Ferry TRITEC developed, constructed and financed Island Nursing and Rehabilitation for the Alliance. This 120-bed nursing facility is a three story nursing structure, with attached administrative wing, and amenities that include large comfortable resident / family lounges, a beauty parlor, a patio, a spacious dining room, a state of the art kitchen, and a daily living kitchen. The project was completed in April 2001.

Shortly after the completion of these projects TRITEC began working on campus at Mather Hospital on campus projects include: New Electrical Room; Physical Therapy; MRI; Operating Rooms; Recreational Rooftop; Dr. Ahmad Office Suite; Pharmacy; Infusion Suite; Emergency Department Restrooms and Emergency Department Modernization

Projects

TRITEC Building Company completed construction of Mather’s pharmacy in the Spring of 2010 the infusion suite in the Fall of 2010 and the Emergency Room Modernization in 2011.

In 2008 TRITEC renovated the Cody Surgical Center, the facility is comprised of 10 operating room suites, a recovery area, a 12-bed intensive care unit, units for cystoscopy, endoscopy, pre-admission testing area, and a separate area for pediatrics. The two new operating rooms built by TRITEC are now some of the most technologically advanced OR’s on Long Island.

TRITEC completed an MRI suite in early 2007 which houses the new MRI, the Signa EXCITE 1.5T HD, with this machine Mather Hospital is able to capture dramatically detailed diagnostic images of patients in high definition.

In 2004 TRITEC added a Physical Therapy suite which offers private treatment areas, a spacious gym with state-of-the-art equipment, whirlpool therapy, and cardiovascular equipment. Parking is conveniently located directly outside of the center, with ADA-approved access.