CD-adapco

TRITEC Building Company was selected as General Contractor for CD-adapco to perform several projects at their Melville, Long Island NY locations.

The exterior of CD-adapco's headquarters needed to reflect the corporate image of this successful high tech company located along Long Island's prestigious Route 110 business corridor. The four story flat building facade was built out to give the building stepped dimensional appeal. The dated brick was updated with several thousand square feet of custom manufactured Dri-Design metal and Ombrae panels. The main vestibule was completely demolished and replaced with a four sided translucent structure and two angular architectural precast concrete columns. New windows were installed on two levels of the building to match recently replaced windows on the third and forth levels. Updated site features and LED lighting on the building topped off the exterior modernization of this building.

Project Size:17,000 square feet
Location:60 Broad Hollow Rd, Melville, Suffolk, New York 11747

Interior upgrades on the first and second levels of the building were provided to compliment the recently completed exterior fa√ßade renovation and to continue recently upgraded finishes on the third and forth levels of the building. During the 6,900 square foot renovation, TRITEC was challenged with the responsibility of maintaining safe egress for CD-adapco’s employee’s on the main level of the building during construction which included a complete interior demolition and re-build in the work zones. TRITEC provided a new layout on both the first and second levels of the building including new partition walls, ceilings, oversized doors, custom cabinetry and millwork, finishes, lighting, an elevator retrofit, restroom renovations, and MEP upgrades

An additional 3,420 square feet of interior renovations were provided for CD-adapco in an adjacent building for new administrative and training facilities, and to accommodate CD-adapco’s expanding staff and frequent visitors. The existing interior building area was demolished and updated to CD-adapco standards including new partitions walls, ceilings, over-sized doors, custom cabinetry, millwork, finishes, lighting, and MEP upgrades.

During the course of the three projects, TRITEC performed additional work at CD-adapco’s headquarters to insure handicap accessibility and complete code compliance throughout the building.